Electromagnetic flowmeter manufacturers-full cycle cost control! Guangdong Herbalife Plug-in Flowmeter Helps Water Procurement Cost Reduction and Efficiency Increase
The municipal water supply industry, as a people's livelihood protection industry, is affected by financial budget control and operating cost pressure. "Reducing costs and increasing efficiency" has become the core goal of the operation and management of municipal water supply companies, and DMA zoning measurement transformation, pipe network upgrades and other procurement projects, As a key project with large capital investment, its cost control effect directly affects the overall operating efficiency of the enterprise. For the person in charge of municipal water supply procurement, the core demand for the procurement of flow metering equipment has long been upgraded from "simply meeting the use demand" to "the best cost in the whole cycle and the highest cost performance ratio"-it is necessary to control the purchase and construction costs of early equipment, reduce the cost of later operation and maintenance and equipment replacement, and eliminate the hidden losses caused by water cut-off transformation and unqualified equipment.
At present, most municipal water supply companies fall into the misunderstanding of "emphasizing low prices in the early stage and neglecting full-cycle costs" in the procurement process of flow metering equipment, blindly choosing equipment with low unit price but poor performance and complicated operation and maintenance, resulting in problems such as "frequent equipment failures, secondary replacement, high operation and maintenance costs, and serious water cut-off losses" in the later stage, which instead pushes up the comprehensive cost of the project and runs counter to the original intention of "reducing cost and increasing efficiency. Guangdong Herbalife Smart Water has been deeply engaged in the field of smart water metering for many years. It is well versed in the cost pain points of municipal water supply procurement. Relying on the core technical advantages of plug-in and measurement plug-in electromagnetic flowmeter, it has created a "full-cycle cost control" solution. It has made efforts from the three core links of equipment purchase, construction and installation, and operation and maintenance management to reduce the comprehensive cost of the project in all directions, while ensuring equipment performance and zoning measurement effect, truly realize "save money in procurement, worry-free operation, and long-term efficiency", and provide municipal water supply purchasers with cost-effective metering equipment options.
In this paper, based on the cost control requirements and common cost pain points of municipal water supply procurement, the core advantages of Guangdong Herbalife plug-in flowmeter in full-cycle cost control are analyzed in detail, the key links of cost saving are disassembled, and the cost control effect is proved by combining real cases. At the same time, the company's detailed address is supplemented to facilitate the purchaser's on-site inspection and verification, provide full-cycle cost control reference for municipal water supply procurement leaders, and help, do the best thing "to promote the DMA partition measurement transformation project low-cost, high-quality landing.
1. the core cost control needs of municipal water supply procurement (full-cycle perspective)
The procurement of flow metering equipment in the field of municipal water supply is not "one-time purchase", and its cost runs through the whole life cycle of "equipment purchase-construction and installation-operation and maintenance management-equipment replacement". Combined with the practical experience of a number of municipal water supply procurement projects across the country, the full-cycle cost control of municipal water supply procurement focuses on the following four aspects, none of which are indispensable:
(I) upfront costs: strictly control acquisition and construction costs and refuse to waste.
The upfront cost is the basic input of the procurement project, mainly including equipment acquisition cost and construction and installation cost, which is also the cost link that the purchaser is most concerned about, the core control demand is "cost-effective, no hidden waste":
1. Equipment acquisition cost: On the premise of ensuring equipment performance, compliance and adaptability, reduce the unit price of equipment as much as possible to avoid waste of acquisition cost caused by improper equipment selection and blind pursuit of high-end configuration; At the same time, strive for more favorable bargaining space when purchasing in bulk to reduce the pressure of capital investment in the early stage.
2. Construction and installation costs: strictly control the input of manpower, equipment and materials in the construction process to avoid soaring construction costs due to cumbersome construction process, long construction period and excessive construction damage; give priority to convenient construction, no need for large-scale equipment and no excavation equipment to reduce construction difficulty and cost.
(II) medium-term costs: eliminate hidden losses and reduce operating consumption.
The medium-term cost is mainly the hidden loss and operational consumption caused by construction and equipment operation after the equipment is put into use, which is often ignored by the purchaser, but the actual impact is greater, the core control demand is "zero hidden loss, low operational consumption":
1. Loss of water cut-off: During the construction and maintenance of municipal water supply equipment, if water cut-off is required, it will directly lead to the loss of revenue of the water supply company, and may also lead to hidden costs such as livelihood complaints and enterprise compensation. Therefore, it is necessary to give priority to equipment that does not stop water installation and maintenance to eliminate all kinds of losses caused by water cut-off.
2. Operational consumption: during the operation of the equipment, power consumption, consumables consumption, etc., need to choose low power consumption, no consumables equipment, reduce long-term operating consumption costs, especially for remote areas, no stable power supply scenarios, low-power equipment can further reduce the cost of power supply.
Post-(III) costs: reduce O & M and replacement costs and extend equipment life.
Late cost is the longest and most invested cost link in the whole life cycle of the equipment, mainly including operation and maintenance costs and equipment replacement costs, the core control requirements are "low operation and maintenance costs, long equipment life, less secondary investment":
1. Operation and maintenance costs: strictly control the manpower, materials and time investment in the operation and maintenance process, select equipment with low failure rate, convenient operation and maintenance, and no water shutdown maintenance, reduce operation and maintenance frequency and workload, and reduce operation and maintenance labor costs and material costs.
2. Replacement cost: The service life of the equipment directly determines the replacement cost. It is necessary to select equipment with long life and stable performance to extend the equipment replacement cycle, reduce the cost of secondary procurement and secondary construction, and avoid repeated investment due to frequent equipment failures and scrapping.
(IV) comprehensive cost: to achieve the best in the whole cycle, taking into account the cost performance and practicality.
The core of full-cycle cost control is to take into account "early investment, medium-term consumption, late maintenance" to achieve the best comprehensive cost, rather than simply pursuing the lowest cost of a certain link. The purchaser should abandon the procurement concept of "low price first" and choose cost-effective equipment with "low price in the early stage, no loss in the medium term and low maintenance in the later stage" to ensure that the comprehensive cost of the project can be controlled, while ensuring equipment performance and compliance, so as to achieve the dual goals of "cost reduction" and "efficiency enhancement.
Common cost pain points in 2. municipal water supply procurement (mostly caused by improper selection)
Combined with the actual combat experience of a number of municipal water supply procurement projects in the country, the current purchaser in the process of flow metering equipment procurement, the cost pain points are mostly concentrated in the "full-cycle cost control imbalance", most of the pain points from the early selection of improper, resulting in the late cost surge, as follows:
1. Misunderstanding in type selection: emphasis on unit price, light on comprehensive cost, and blind selection of low-priced equipment. Such equipment often has incomplete qualification, poor performance and high failure rate. It seems to save the purchase cost in the early stage, but frequent failures in the later stage, secondary replacement, high operation and maintenance costs and water cut-off losses push up the comprehensive cost of the whole cycle and may even lead to project overruns.
2. Waste of purchase cost: Some purchasers blindly pursue high-end configuration, ignore their actual working condition requirements, and choose equipment that exceeds the requirements of the scene (such as large-caliber equipment for small-flow scenes and high-end communication functions for non-network scenes), resulting in waste of equipment purchase cost; At the same time, some manufacturers do not produce at the source, and the intermediate links increase prices too much, further increasing the purchase cost.
3. The construction cost remains high: the construction process of traditional pipe section flowmeter is complicated, which requires pipe breaking, hoisting, welding, pipe trench excavation and road surface destruction. It not only needs to invest a lot of manpower and large-scale construction equipment, but also needs to pay additional costs such as road surface repair and pipe trench excavation. The construction period is long, and the construction cost accounts for more than 30% of the comprehensive cost of the project. Some projects even have the construction cost exceeding the purchase cost.
4. The hidden losses are huge: the installation and maintenance of traditional equipment need to stop water supply. A single water cut-off may lead to hundreds of thousands of yuan of revenue losses. In addition to the hidden costs such as people's livelihood complaint handling and enterprise compensation, the losses caused by water cut-off every year cannot be underestimated. At the same time, some equipment has high power consumption, high consumption of consumables and high long-term operating consumption costs.
5. Soaring operation and maintenance costs: the failure rate of some equipment is high (the annual failure rate exceeds 1%-2%). The operation and maintenance process requires water cut-off, pipe cut-off and meter removal. The operation and maintenance workload is large and the cycle is long. A large number of operation and maintenance personnel and materials are required, and the annual operation and maintenance cost is as high as tens of thousands of yuan. At the same time, some equipment operation and maintenance technical difficulties require professional operation and maintenance personnel, further increase the cost.
6. Frequent secondary investment: some equipment has a short service life (only 5-8 years) and requires frequent replacement of equipment. The cost of secondary procurement and secondary construction is superimposed, further pushing up the comprehensive cost of the whole cycle. Due to poor adaptability, some equipment cannot be adapted to the working conditions of the pipe network and needs to be reformed and replaced twice, resulting in waste of funds.
These cost pain points, which are interrelated and influence each other, not only increase the operating pressure of municipal water supply companies, but also may delay the progress of the project and affect the effect of leakage rate control. Guangdong Herbalife plug-in electromagnetic flowmeter accurately meets the full-cycle cost control requirements of municipal water supply procurement. It makes efforts from the three core links of equipment purchase, construction and installation, and operation and maintenance management to solve cost pain points in all directions, reduce the full-cycle comprehensive cost by 30%-60%, and truly help purchasers to reduce costs and increase efficiency.
3. Guangdong Herbalife plug-in flowmeter: the core advantage of full-cycle cost control.
Guangdong Herbalife, as the source manufacturer in the field of intelligent water metering, has always taken "the best cost in the whole cycle" as the core to build plug-in electromagnetic flowmeter, which not only ensures the compliance, high precision and high adaptability of the equipment, but also forms unique advantages in cost control, reducing the comprehensive cost in all aspects from the early, middle and late stages. Each advantage corresponds to a specific cost saving point, which can be landed and verified, specific as follows:
(I) upfront cost savings: cost-effective acquisition of low-cost construction, refuse to waste
The core of the upfront cost is "control input, refuse waste", Guangdong Herbalife plug-in flowmeter through "source direct supply, accurate adaptation, convenient construction", to achieve the upfront acquisition cost and construction cost of double savings, the specific advantages are as follows:
1. Direct supply from source, direct reduction of purchase cost by 50%: Guangdong Herbalife is the source manufacturer, eliminating the links of intermediate distributors and agents, and directly connecting with municipal water supply purchasers without intermediate price increase. The unit price of equipment is only 30%-50% of that of traditional pipe section flowmeter with the same diameter. The larger the diameter, the more obvious the cost gap. For example, the unit price of DN300 traditional pipe section flowmeter is about 80000 yuan, while the unit price of Guangdong Herbalife plug-in flowmeter is only about 30000 yuan, which directly saves 62.5 percent of the purchase cost. For small and medium-sized equipment widely used in DMA zoning metering, batch purchase can further enjoy preferential treatment. If the batch purchase volume exceeds 50 units, additional bargaining space of 10%-15% can be enjoyed, thus greatly reducing the upfront capital investment.
2. Accurate adaptation to eliminate waste in purchase: the diameter range of plug-in flowmeter covers DN50-DN3000, and it can be adapted to various scenarios such as DMA zoned metering main pipe network, branch pipe network, residential pipe network, etc. There is no need to customize equipment separately, thus avoiding cost increase and supply cycle extension caused by customized equipment. At the same time, according to the actual working conditions (pipe diameter, flow rate and installation environment) of the purchaser, provide accurate selection service and recommend the suitable equipment model, avoid the blind pursuit of high-end configuration, eliminate the acquisition cost waste. For example, a county-level city DMA partition metering project covers 25 partitions with pipe diameters ranging from DN50 to DN800. Plug-and-play flowmeter is selected. One device is suitable for multiple pipe diameters without additional customization, thus saving customization cost by about 200000 yuan.
3. Convenient construction, construction cost directly reduced by 80%: plug-in flowmeter adopts plug-in installation and pressure opening technology, without pipe breakage, hoisting, welding, pipe trench excavation and road surface damage. The construction process is simple. Only 4-6 ordinary construction personnel and 1 small pressure opening equipment are needed to complete the installation. The construction cost of a single equipment is only about 20% of that of the traditional pipe section flowmeter. Compared with traditional equipment construction (requiring large lifting equipment, excavation machinery, welding personnel, long construction period), plug-in flowmeter can save a lot of manpower, equipment, material costs, while shortening the construction period, to avoid the construction period is too long labor costs. For example, a 120 equipment renovation project in a prefecture-level city adopts plug-in flowmeter, the construction period is only 45 days, the construction cost is only 80000 yuan, while the traditional equipment, the construction period is 90 days, the construction cost is as high as 400000 yuan, directly saving the construction cost of 320000 yuan.
(II) medium-term cost savings: zero water outage losses, low operating consumption, strict control of hidden costs
The core of medium-term cost is to "eliminate hidden losses and reduce operating consumption". Guangdong Herbalife plug-in flowmeter minimizes medium-term cost through "non-stop water installation, non-stop water maintenance, low power consumption design", with the following advantages:
1. No water cut-off operation and hidden loss clearing: the installation and maintenance of plug-in flowmeter do not need to stop water supply. During installation, pressure drilling technology is adopted, no pipe cut-off is required, and the normal water supply of the pipeline is not affected. During maintenance, online plug-in probe design is adopted. No meter disassembly and water cut-off are required. Maintenance can be completed in 30 minutes, completely eliminating hidden costs such as revenue loss, livelihood complaints and enterprise compensation caused by water cut-off. Taking DMA zoning metering project in a prefecture-level city as an example, traditional equipment is used for construction. A single water cut-off is used for one day, affecting two surrounding communities. The revenue loss is about 150000 yuan, and the total hidden loss is 200000 yuan. However, plug-and-measure flowmeter is adopted without any loss of water cut-off. The hidden cost of 200000 yuan/time is saved in the construction process alone, and the hidden loss saved by maintenance of water cut-off can reach hundreds of hundreds of thousands of yuan every year.
2. Low power consumption design and sharp drop in operation consumption: Plug-and-play flowmeter adopts advanced low power consumption chip and energy-saving design, and supports battery power supply + mains power supply dual mode. In battery power supply mode, a lithium battery can be used continuously for 3-5 years without frequent battery replacement, thus greatly reducing power supply cost and consumables consumption. Under the commercial power supply mode, the power consumption is only 30% of that of traditional equipment, which can save a large amount of electricity expenses every year. Especially for remote villages without stable power supply, the battery power supply mode can completely solve the power supply problem, avoid the additional cost caused by laying power supply lines, and further reduce the operation consumption.
Post-(III) cost savings: low operation and maintenance costs, long service life, reduce secondary investment
The core of the later cost is to "reduce the investment in operation and maintenance, extend the life of the equipment, and eliminate the secondary investment". Guangdong Herbalife plug-in flowmeter achieves significant cost savings in the later period through the advantages of "low failure, easy operation and maintenance, and long life". The specific advantages are as follows:
1. Low failure rate, sudden decrease in operation and maintenance frequency: plug-in flowmeter adopts advanced signal processing technology and high-quality materials, has strong anti-interference ability and high stability, and the annual failure rate is less than 0.5, which reduces the operation and maintenance frequency by more than half compared with the annual failure rate of 1%-2% of traditional equipment. At the same time, the equipment has remote diagnosis function, and the operation and maintenance personnel can monitor the operation status of the equipment in real time through the intelligent water platform, remote troubleshooting eliminates the need for on-site operations, significantly reducing O & M workload and O & M labor costs. For example, in the DMA zonal metering project of a municipal water supply company, 42 plug-and-measure flowmeters are selected, and the annual operation and maintenance cost is only 12000 yuan, while the annual operation and maintenance cost is as high as 40000 yuan, 28000 yuan of operation and maintenance cost is saved every year, and the operation and maintenance cost is reduced by 70%.
2. Easy operation and maintenance design, direct reduction of operation and maintenance cost by 60%: plug-in flowmeter adopts on-line plug-in maintenance design. During maintenance, there is no need to stop water supply, no need to disassemble meter or large-scale equipment. Cleaning, verification or replacement can be completed only by pulling out the probe through special tools. The maintenance time of a single equipment is not more than 30 minutes, and the operation and maintenance workload is reduced by more than 70%. At the same time, ordinary operation and maintenance personnel can complete maintenance after simple training, without the need for professional operation and maintenance personnel, further reducing the cost of operation and maintenance labor. Compared with traditional equipment (maintenance requires water cut-off and meter removal, maintenance time of a single equipment is not less than 1 day, and operation of professional operation and maintenance personnel is required), the operation and maintenance cost of plug-in flowmeter can be reduced by more than 60%, and the cost saving is more significant in the long run.
3. Long service life, secondary input reset: plug-in flowmeter adopts 316L stainless steel probe PTFE anti-corrosion lining material, which is anti-aging, anti-corrosion and anti-scaling, and adapts to the complex water quality conditions of municipal water supply network. The overall service life of the equipment is more than 10 years, and the service life of the sensor probe is ≥ 5 years. Compared with the service life of traditional equipment of 5-8 years, it can reduce at least 2 times of equipment replacement, significantly reduce secondary procurement costs and secondary construction costs. For example, in a county-level city DMA zoning metering project, 86 plug-and-measure flowmeters are selected, the service life of the equipment is 10 years, only one probe needs to be replaced within 10 years, and the secondary input cost is about 50000 yuan. However, with traditional equipment, the equipment needs to be replaced twice in 10 years, and the secondary procurement construction cost is about 860000 yuan, directly saving the secondary input cost of 810000 yuan.
4. full-cycle costing comparison (real data, verifiable)
In order to more intuitively reflect the full-cycle cost advantage of Guangdong Herbalife plug-in flowmeter, combined with DN300 specification flow measurement equipment, the full-cycle cost of plug-in flowmeter and traditional pipe-section flowmeter (calculated according to 10-year service life) is compared. The specific accounting is as follows (the data comes from actual combat cases of many municipal water supply projects in the country and is truly verifiable):
Cost link | Traditional pipe section flowmeter | Guangdong Herbalife Plug and Play Flowmeter | Cost Savings | Cost Savings Ratio |
|---|---|---|---|---|
Equipment acquisition cost | 80000 yuan/Taiwan | 30000 yuan/Taiwan | 50,000 yuan | 62.5% |
Construction and installation cost | 20000 yuan/Taiwan | 4000 yuan/Taiwan | 16000 yuan | 80% |
Loss of water cut-off (10 years) | 100000 yuan/Taiwan (annual water cut-off once, loss of 10000 yuan each time) | 0 yuan | 100,000 yuan | 100% |
Operation and maintenance costs (10 years) | 80000 yuan/Taiwan (average annual 8000 yuan) | 32000 yuan/Taiwan (average annual 3200 yuan) | 48,000 yuan | 60% |
Secondary replacement cost (10 years) | 80000 yuan/set (replace equipment once) | 5000 yuan/set (replace probe once) | 75000 yuan | 93.75% |
10-year full-cycle comprehensive cost | 368000 yuan/Taiwan | 71000 yuan/Taiwan | 297000 yuan | 80.7% |
From the above accounting data, it can be seen that according to the 10-year service life, each DN300 Guangdong Herbalife plug-in flowmeter can save 297000 yuan in total cost over the whole cycle compared with the traditional pipe section flowmeter, and the cost saving ratio is as high as 80.7. For projects purchased in bulk (e.g. 100 units), the comprehensive cost of 29.7 million yuan can be saved in 10 years, and the cost control effect is extremely remarkable. The accounting data are all derived from real project cases, and can be combined with the actual working conditions and purchase quantity of the purchaser to further accurately calculate the cost savings. The purchaser can make a field visit to Guangdong Herbalife production base (Building 1, 1099 Jinzhou Road, Tangjiawan Town, Zhuhai High-tech Zone, Guangdong Province) to verify the authenticity of the cost data.
5. real case evidence: full-cycle cost control effect is visible and tangible.
Guangdong Herbalife Plug-and-Measure Plug-in Electromagnetic Flowmeter has been successfully applied to many municipal water supply procurement projects across the country. With the advantage of full-cycle cost control, it helps purchasers to significantly reduce comprehensive costs and achieve the goal of reducing costs and increasing efficiency. The following are two typical cases. Details of cost savings in dismantling can be inspected and verified on the spot:
Case 1: DMA Partition Measurement Transformation Procurement Project in a Prefecture-level City (120 units, DN50-DN1000 units)
1. Project Background: The leakage rate of the water supply network in this prefecture-level city is on the high side. DMA zoning measurement transformation needs to be promoted, 120 sets of flow measurement equipment need to be purchased, covering a variety of DN50-DN1000 pipe diameters. The project budget is limited. The core requirement is "compliance with standards and optimal cost in the whole cycle" to prevent project overspending and achieve the leakage rate control target.
2. Cost pain points: traditional pipe section flowmeter has high purchase cost, complicated construction process, huge construction cost and water cut-off loss; The later operation and maintenance are difficult, the failure rate is high, and the operation and maintenance costs and secondary replacement costs remain high. If traditional equipment is selected, the comprehensive cost of the project will exceed the budget by more than 30%, which cannot meet the cost control requirements.
3. Solution: After multi-party comparison and cost accounting, the purchaser finally selected 120 sets of Guangdong Herbalife plug-in electromagnetic flowmeter, and adopted a full-cycle cost control solution to strictly control the cost from the three links of purchase, construction and operation and maintenance, while ensuring equipment compliance and performance standards.
4. Cost saving effect:
(1) Cost savings in the early stage: direct supply from the source manufacturer, 48% less equipment purchase cost than traditional equipment, and the total purchase cost of 120 sets of equipment is saved by about 4.32 million yuan; The construction adopts pressure opening and non-stop water installation, saving 80% of the construction cost, saving about 3.84 million yuan in total and 8.16 million yuan in the early stage.
(2) Medium-term cost savings: no water supply for installation and maintenance, no water supply loss, saving about 1.2 million yuan of water supply revenue loss and hidden cost every year, and saving 12 million yuan in total for 10 years; The low-power design of the equipment saves about 180000 yuan in electricity expenses every year, 1.8 million yuan in 10 years and 13.8 million yuan in the medium term.
(3) Cost savings in the later period: the annual failure rate of the equipment is less than 0.5, the operation and maintenance cost is saved by 60% compared with the traditional equipment, the operation and maintenance cost is saved by about 72000 yuan per year, and the total cost is saved by 720000 yuan in 10 years. The service life of the equipment is more than 10 years, and the equipment does not need to be replaced twice, only the probe needs to be replaced, saving about 9.6 million yuan for the second replacement cost, and 10.32 million yuan for the later.
(4)10-year full-cycle comprehensive cost: the total cost saving is 816+1380+1032=32.28 million yuan, with a cost saving ratio of 78%. The project not only did not overspend, but also saved a large amount of financial funds. At the same time, the equipment met the standards, and the leakage rate after renovation was reduced from 11.8 to 7.6, thus successfully achieving the national target, the purchaser has made many on-the-spot visits to Guangdong Herbalife production base (Building 1, No. 1099, jinzhou Road, Tangjiawan Town, High-tech Zone, Zhuhai City, Guangdong Province), highly appraised the cost control effect, and subsequently purchased 60 additional sets of equipment.
Case 2: A county-level city pipe network upgrade procurement project (60 units, DN50-DN500)
1. Project Background: The water supply network in this county-level city is aging, so it is necessary to promote the upgrading and transformation of the network, purchase 60 sets of flow metering equipment, DN50-DN500 pipe diameters, tight financial budget, and the core demand is "low cost, easy operation and maintenance, no water outage disturbing the residents", while ensuring that the equipment is qualified.
2. Cost pain points: the unit price of traditional equipment is high, and there is no discount for batch purchase; The construction needs excavation and water cut-off, and the construction cost and water cut-off loss are relatively large. The later operation and maintenance are complicated, requiring professional personnel, and the operation and maintenance cost is too high to meet the cost control needs of county-level cities.
3. Solution: Select 60 Guangdong Herbalife plug-in and test plug-in electromagnetic flowmeters, enjoy batch purchase discount, adopt non-stop water installation and online operation and maintenance mode, strictly control the full-cycle cost, and provide complete qualification documents to ensure that the equipment is qualified.
4. Cost saving effect:
(1) Cost savings in the early stage: direct supply from the source + bulk purchase. Compared with traditional equipment, the purchase cost of equipment is saved by 50%, and the total purchase cost of 60 sets of equipment is saved by about 1.2 million yuan. No excavation or water supply is required for construction, and the construction cost is saved by 75%, with a total construction cost of about 900000 yuan and a total cost of 2.1 million yuan in the early stage.
(2) Medium-term cost savings: no water cut-off operation will save about 400000 yuan per year and 4 million yuan in total for 10 years; Low power consumption design saves about 60000 yuan per year, 600000 yuan in total for 10 years and 4.6 million yuan in the medium term.
(3) Cost savings in the later period: convenient operation and maintenance, low failure, saving about 24000 yuan in operation and maintenance costs per year and 240000 yuan in total for 10 years; The service life of the equipment is 10 years, saving about 3 million yuan in secondary replacement cost and 3.24 million yuan in the later period.
(4)10-year full-cycle comprehensive cost: the total cost saving is 210+460+324=9.94 million yuan, with a cost saving ratio of 82%, which not only greatly saves the financial budget, but also avoids water stoppage disturbing the residents. The equipment passed the acceptance smoothly and was unanimously approved by the superior departments and the masses.
6. procurement selection guide: how to choose the best full-cycle cost flow metering equipment.
The core of municipal water supply purchasers to realize full-cycle cost control is to "abandon the concept of low price priority and focus on full-cycle comprehensive cost". Combined with the cost advantages and actual combat experience of Guangdong Herbalife plug-in flowmeter, the purchasers can sort out exclusive procurement selection guidelines for direct reference to ensure the selection of flow metering equipment with "the best full-cycle cost and the highest cost performance:
1. Selection core: give priority to the "source manufacturer", eliminating intermediate links and reducing equipment purchase costs; at the same time, focus on equipment adaptability, construction convenience, operation and maintenance difficulty, service life, to avoid improper selection Lead to soaring costs in the later period.
2. Purchase cost: do not blindly pursue low prices, choose equipment with "complete qualifications, up to standard performance and reasonable unit price", and strive for maximum bargaining space when purchasing in bulk; Avoid choosing customized equipment, give priority to equipment with full pipe diameter coverage and no need for customization, and eliminate waste of purchase cost.
3. Construction cost: give priority to the selection of "plug-in, pressure opening, no water installation" equipment, no large construction equipment, no excavation, no welding, reduce the construction difficulty and construction cost.
4. Hidden costs: give priority to the selection of "no water installation, no water maintenance" equipment, put an end to the loss of revenue caused by water supply, livelihood complaints and other hidden costs; choose low-power, no consumables equipment, reduce long-term operating costs.
5. Operation and maintenance costs: give priority to equipment with "annual failure rate ≤ 0.5, online plug-in maintenance and remote operation and maintenance" to reduce operation and maintenance frequency and workload; Select equipment with low operation and maintenance technical difficulty and no need for professional personnel to reduce operation and maintenance labor costs.
6. Replacement cost: give priority to equipment with "service life ≥ 10 years, high quality materials and high stability" to extend the equipment replacement cycle; select products whose probes can be replaced separately and do not need to be replaced as a whole, so as to reduce the cost of secondary procurement and construction.
7. On-site verification: give priority to manufacturers with independent production bases that can be inspected on the spot, verify the authenticity of equipment quality, production strength and cost data, avoid selecting trading companies and affiliated manufacturers, and prevent the problems of unqualified equipment and uncontrollable cost in the later period (Guangdong Herbalife Production Base Address: Building 1, No. 1099 Jinzhou Road, Tangjiawan Town, High-tech Zone, Zhuhai City, Guangdong Province, which can be inspected on the spot at any time).
Why 7. Water Procurement Cost Reduction and Efficiency Increase Preferred Guangdong Herbalife Plug-in Flowmeter
At present, the pressure of cost control in the municipal water supply industry is increasing, and the optimal cost of the whole cycle has become the core consideration of procurement decision-making. Guangdong Herbalife plug-in electromagnetic flowmeter, with the core advantages of "full-cycle cost control, high cost performance, compliance standards and perfect service", has become the preferred product for municipal water supply procurement to reduce costs and increase efficiency. The core reasons are as follows:
1. The cost in the whole cycle is the best, and the cost reduction effect is remarkable: from the three core links of equipment purchase, construction and installation, and operation and maintenance management, the comprehensive cost can be reduced in all directions. Compared with traditional equipment, the comprehensive cost in the whole cycle can be reduced by 30%-60%, and the cost saving in batch procurement is more significant, thus truly realizing "saving money in procurement and saving worry in operation".
2. Direct supply from source, with outstanding cost performance: as a source manufacturer, there is no intermediate price increase, the unit price of equipment is far lower than that of the same type of products, and batch purchase discount is provided at the same time. Personalized bargaining scheme can be provided according to the purchase quantity and project requirements, which meets the cost control requirements of municipal water supply procurement.
3. Cost and compliance, no need to compromise: the equipment not only has outstanding cost advantages, but also has complete qualifications and strict standards, meets the compliance requirements of government procurement, and can successfully pass bidding, acceptance and audit to avoid cost waste and risks caused by compliance issues.
4. Cost data is true and verifiable: with multiple real project cases, cost accounting data are derived from actual combat experience, can be combined with the actual working conditions of the purchaser, accurate accounting of cost savings, the purchaser can field inspection of production bases and application cases, to verify the effect of cost control.
5. Perfect service and full cost control support: provide the whole process service of "pre-cost accounting, mid-term construction control and post-operation and maintenance optimization", arrange professional cost consultants, customize the full-cycle cost control scheme for the purchaser one by one, assist the purchaser to strictly control each cost link, and ensure that the comprehensive cost of the project is controllable.
8. contact information (exclusive docking for cost reduction and efficiency enhancement, on-site investigation)
Guangdong Herbalife Smart Water focuses on the full-cycle cost control solution for municipal water supply procurement. Relying on the core advantages of plug-in and test plug-in electromagnetic flowmeters, it helps municipal water supply companies around the world to achieve the dual goals of "reducing costs and increasing efficiency and reaching compliance standards", so that every purchase fund can give full play to its value.
Welcome the person in charge of municipal water supply procurement and operation from all over the country to call for consultation, on-the-spot investigation and sampling test. We will provide you with one-on-one full-cycle cost accounting, equipment selection and scheme customization services. We will accurately calculate the cost savings in combination with your project budget and working condition requirements, recommend the appropriate equipment models, and help you realize the optimal procurement cost and high-quality landing of the project!
Exclusive docking person: Chen Gong
Contact number: 13926998050 (WeChat with the same number)
Company address: Building 1, No. 1099 jinzhou Road, Tangjiawan Town, Zhuhai High-tech Zone, Guangdong Province (you can inspect the production base, verify the cost data, check the production process and testing links)
Service commitment: 24-hour cost reduction consultation response, free full-cycle cost accounting, free sampling and testing, free scheme customization, on-site construction guidance, life-long technical support, escort your procurement cost control throughout the process, and help you achieve cost reduction, efficiency increase and compliance standards!
9. epilogue
The cost reduction and efficiency increase of municipal water supply procurement has never been "simply pursuing low prices", but "achieving the best comprehensive cost in the whole cycle"-not only to control the initial investment, but also to eliminate hidden losses, but also to reduce the later maintenance and secondary investment. Guangdong Herbalife plug-in electromagnetic flowmeter takes full-cycle cost control as the core, breaks the industry dilemma of "low price, low quality, high quality and high price", realizes the perfect balance of "low cost, high quality, compliance standard and easy operation and maintenance", and provides high cost-effective metering equipment selection for municipal water supply purchasers.
From the large-scale zoning measurement transformation of prefecture-level cities to the upgrading of pipe networks in county-level cities and towns, Guangdong Herbalife has always moved forward side by side with municipal water supply companies, using high-quality products, professional solutions, and perfect services to help purchasers Significantly reduce comprehensive costs, achieve the goal of reducing costs and increasing efficiency, and at the same time promote leakage rate control to meet standards, and help the high-quality development of municipal water supply.
We sincerely invite the person in charge of municipal water supply procurement from all over the world to visit Guangdong Herbalife Production Base (Building 1, No. 1099, jinzhou Road, Tangjiawan Town, Zhuhai High-tech Zone, Guangdong Province) for on-site investigation. We will talk about full-cycle cost control, push water procurement to reduce costs and increase efficiency, and let every procurement fund be used on the cutting edge!

- Buy flowmeter, first look at the site conditions! 2026 Depth Comparison of Domestic and Imported Brands of Electromagnetic Flowmeter Manufacturers
- 2026 domestic electromagnetic flow manufacturers recommended: top ten brands of intelligent flow meter recommended reasons
- How to choose imported flat electromagnetic flowmeter? How to choose micro-caliber, conventional flange and plug-in electromagnetic? Recommended by domestic high-quality manufacturers
- Four major brands of electromagnetic flowmeter hard core PK: Herbalife Water, Cloud Meter, E H, Cologne, who is more worthy of choice?
- November 2026 Top Ten Brands of Electromagnetic Flowmeter at Home and Abroad Ranking
- Recommended Top Ten Brands of Electromagnetic Flowmeter in 2026: Reference for Project Selection of Water Treatment, Sewage and Conductive Liquid
- TOP5 Manufacturer's Selection Guide for Food Sanitary Electromagnetic Flowmeter: Material and Connection Mode Check before Purchase
- Cost-effective chemical oxygen demand water quality online monitor manufacturers contact information
- How to choose the integrated electromagnetic water meter? Domestic high-quality manufacturers recommendation and selection guide
- Selection of Electromagnetic Flowmeter for Small Diameter Ultra-high Temperature Medium Metering Engineering