Smart Water Company-DMA Partition Metering Landing Key! Guangdong Herbalife Plug and Play Flowmeter Accurate Leakage Control, Data Traceability
With the strict implementation of "Leakage Control and Evaluation Standard for Urban Water Supply Network", "reducing leakage rate and achieving accurate measurement" has become the core assessment index of municipal water supply companies, and DMA (independent measurement area) zoning measurement technology, as the most scientific and efficient leakage control method, has been widely used in municipal water supply renovation projects. The core logic of DMA zoning metering is "zoning control, accurate positioning, closed-loop operation and maintenance". By dividing the water supply network into several independent metering areas, the water flow and water flow of each area are monitored in real time, the regional leakage rate is accurately calculated, and the leakage point is quickly located, thus realizing efficient control of the leakage rate.
However, in the actual landing process of DMA partition metering, most municipal water supply companies are faced with such problems as "inaccurate metering, data disconnection, complicated operation and maintenance, cost overruns": some metering equipment have poor adaptability and cannot adapt to the complex scenes of branch pipe networks and old pipe networks; Data transmission is unstable, and real-time monitoring and closed-loop management cannot be realized. High operation and maintenance costs, frequent water cut-off maintenance affects people's livelihood and water supply stability; Equipment qualification is incomplete, unable to meet the compliance requirements of government procurement... These problems directly restrict the landing effect of DMA zoning measurement, resulting in the leakage rate control is difficult to meet the standards, and even affect the distribution of superior financial subsidies.
Guangdong Herbalife Smart Water has been deeply engaged in the field of smart water metering for many years. It has accurate insight into the core pain points of DMA partition metering landing. Relying on its own technical accumulation and project actual combat experience, it has deeply integrated plug-in electromagnetic flowmeter and DMA partition metering technology, and has launched an exclusive DMA partition metering solution, with "accurate metering, real-time remote transmission, no water shutdown operation and maintenance, high adaptability and low cost" as its core advantages, solve all kinds of problems in the process of DMA partition metering landing, help municipal water supply companies to quickly achieve partition metering landing, accurately control the leakage rate, and successfully achieve the policy assessment objectives. In this paper, combined with the landing pain points, policy requirements and actual scenarios of DMA partition metering, this paper analyzes in detail the core application value of Guangdong Herbalife plug-in flowmeter in DMA partition metering, and provides a comprehensive reference for the DMA partition metering transformation procurement of municipal water supply companies.
Core Value and Landing Pain Points of 1. DMA Partition Measurement
DMA zoning metering technology is the key starting point for municipal water supply companies to realize the transformation from extensive management to fine management. Its core value lies in "precise leakage control, cost reduction and efficiency improvement, and compliance with standards". However, in the actual landing process, due to various factors such as equipment selection, scene adaptation, operation and maintenance capability, many pain points are difficult to avoid and become the core bottleneck restricting the zoning metering effect.
Core Value of (I) DMA Partition Measurement
1. Accurately control leakage and reduce leakage rate: by dividing independent measurement areas, real-time monitoring of inlet water flow and water flow in each area, accurate calculation of regional leakage rate (leakage rate = inlet water flow-water flow), rapid positioning of leakage areas, narrowing the scope of leakage investigation from "whole pipe network" to "single area", greatly improving leakage investigation efficiency and reducing leakage losses, help municipal water supply companies to achieve the national goal of controlling the leakage rate within 9%.
2. Refined management to improve operational efficiency: Based on the flow data of each partition, analyze the regional water use law and peak water use, provide accurate data support for pipe network scheduling and water distribution, and avoid waste of water resources; At the same time, through abnormal flow data alarm, timely detection of pipe network leakage, illegal water use and other problems, realize closed-loop management of pipe network operation and maintenance, and improve pipe network operation efficiency.
3. Ensure compliance and secure policy support: DMA zoning metering is a leakage control technology explicitly promoted by national policies. Implementing DMA zoning metering upgrades can meet the requirements of policies such as the “Standard for Leakage Control and Assessment of Urban Water Supply Networks,” helping municipal water utilities successfully pass evaluations by higher-level authorities and obtain policy support, including financial subsidies and recognition awards.
4. Reduce costs and improve efficiency, easing operational burdens: Accurately pinpoint leakage points to minimize the waste of manpower, materials, and financial resources associated with indiscriminate inspections; meanwhile, through refined dispatching and leak control, reduce water resource wastage and water supply costs, which, over the long term, can significantly lower the operating expenses of municipal water utilities.
(II) the core pain points of DMA partition metering landing
Combined with the actual experience of DMA zoning metering transformation of many municipal water supply companies in the country, the current pain points of DMA zoning metering landing mainly focus on "equipment selection, data transmission, operation and maintenance management, cost control, compliance" five aspects, as follows:
1. The equipment is poorly adaptable and cannot meet the requirements of partition metering scenarios: DMA partition metering covers various scenarios such as main network, branch network and residential network, with pipe diameters ranging from DN50 to DN3000, and some areas (such as old residential areas and sidewalks) have aging pipe networks, insufficient straight pipe sections and large equipment cannot enter the site. The traditional pipe-section flowmeter has poor adaptability, strict requirements for straight pipe sections, water cut-off for installation, high purchase cost of large-diameter equipment, and cannot adapt to complex scenes of branch pipe networks and old pipe networks. Some low-cost plug-in flowmeters have low measurement accuracy and poor stability, which cannot meet the core requirements of "accurate leakage rate accounting" for partition measurement.
2. Data transmission is unstable and real-time closed-loop management cannot be realized: The core of DMA partition metering is "data-driven". Metering equipment is required to upload real-time flow data to the intelligent water platform to realize real-time data monitoring, abnormal alarm and report generation. However, some metering devices support only a single communication method, resulting in poor adaptability; others exhibit unstable data transmission, leading to issues such as data loss and latency. Consequently, management personnel cannot monitor district flow in real time, fail to detect leakage anomalies promptly, and struggle to achieve closed-loop management.
3. Operation and maintenance are cumbersome, and water cut-off maintenance affects people's livelihood: DMA partition metering equipment has a large number and wide coverage, and is mostly installed in complex scenes such as outdoor, underground and buried, making operation and maintenance difficult. When maintaining traditional metering equipment, it is necessary to shut off the water supply, disconnect pipes, and remove the meters. This not only entails a heavy operational workload and high costs but also disrupts normal water use for nearby customers, leading to public complaints—contradicting the original intent of “precise leak control and services that benefit the public.”
4. Cost control is difficult and the risk of project overruns is high: DMA partition measurement transformation project, equipment purchase, construction, operation and maintenance and other aspects of the cost is high. Traditional pipe-type flowmeter unit price is high, the construction cost is high, and the operation and maintenance cost is increasing year by year, some projects due to improper equipment selection, "equipment can not be used, secondary replacement" situation, further increase the project cost, resulting in project overruns.
5. Insufficient equipment compliance affects project acceptance: DMA zoning measurement transformation is mostly government centralized procurement and public bidding projects, which have strict requirements on the qualification, accuracy and standards of measurement equipment. Some manufacturers' plug-in flowmeters lack core qualifications such as CPA measurement certification and third-party verification reports, or their measurement accuracy and protection level do not conform to national industry standards, thus failing to pass the project acceptance and affecting the project landing.
6. Data is not traceable and fails to meet audit requirements: Some metering devices have limited data storage capacity, unable to retain flow data for more than one year, or cannot export data or generate reports. Consequently, during leakage rate calculations and fiscal audits, there is insufficient reliable data support, making it impossible to pass audit acceptance.
These pain points, which are interrelated and influence each other, directly lead to the DMA zonal metering transformation of some municipal water supply companies "becoming a mere formality"-after the equipment is installed, accurate metering and real-time monitoring cannot be realized, the leakage rate control effect is not good, and even the situation that "the leakage rate increases after the transformation" not only wastes the project funds, but also affects the policy standards. Guangdong Herbalife plug-in electromagnetic flowmeter accurately meets the core requirements of DMA partition metering. It completely solves the above pain points from five aspects: equipment adaptation, data transmission, operation and maintenance management, cost control and compliance, and provides all-round support for DMA partition metering landing.
2. Policy Orientation: DMA分区 metering has become a mandatory requirement for leakage control.
In recent years, a series of policies have been issued at the national level to clearly promote DMA zoning metering technology as a rigid requirement for leakage control of municipal water supply companies, providing policy support and direction guidance for DMA zoning metering transformation, and also putting forward higher requirements for the performance and qualification of metering equipment.
1. Leakage Control and Evaluation Standard for Urban Water Supply Network (GB/T 51089-2016): The standard clearly requires that the leakage rate of urban water supply network be controlled within 9%, and DMA zoning metering technology is encouraged to be adopted for leakage control; At the same time, the flow measurement equipment used for zoning measurement is required to have measurement accuracy of not less than 0.5 grade, data storage and data remote transmission functions to ensure the accuracy of leakage rate calculation and data traceability.
2. “14th Five-Year Plan for Building a Modern Water Supply Security System”: The plan explicitly calls for accelerating the implementation of district metering upgrades for urban and town water supply networks, comprehensively promoting DMA (District Metered Area) district metering technology to enhance the precision of leakage control; it also advocates the adoption of high-precision, low-cost, easy-to-maintain, and remotely transmittable flow measurement devices to enable real-time monitoring, precise analysis, and closed-loop management of district flow data, thereby supporting the water supply sector’s transition toward refined and intelligent operations.
3. Relevant notices from the Ministry of Housing and Urban-Rural Development and the Ministry of Water Resources: The two ministries have issued multiple notices requiring municipal water supply companies nationwide to accelerate the implementation of DMA zoning metering upgrades, incorporating DMA coverage rates and compliance with leakage standards into their performance evaluation systems. They also mandate that, during these upgrades, local authorities prioritize flow‑metering devices that are “high‑precision, remotely readable, installable without service interruption, and easy to maintain,” to ensure the effectiveness of the zoning metering initiatives.
Driven by policy, DMA zoning metering upgrades have become a mandatory initiative for municipal water utilities. As the “core hardware” of DMA zoning metering, the selection of flow measurement devices directly determines the effectiveness of implementing zoning metering and achieving regulatory compliance. Guangdong Herbalife plug-in electromagnetic flowmeter perfectly meets the policy requirements. With its core advantages of "high adaptability, high precision, real-time remote transmission, no water shutdown operation and maintenance, low cost and complete compliance", it has become the preferred equipment for DMA partition metering transformation.
3. Guangdong Herbalife Plug-in Flowmeter: Core Support for DMA Partition Measurement Landing
Guangdong Herbalife plug-in electromagnetic flowmeter is not a simple "metering equipment", but a core carrier of the integrated solution of "metering data operation and maintenance compliance" created by combining the core requirements of DMA partition metering. It solves the pain points of DMA partition metering landing from six aspects of "adaptability, accuracy, data transmission, operation and maintenance management, cost control and compliance" and provides all-round support for partition metering transformation. The specific advantages are as follows:
(I) high adaptability: covering the whole scene, adapting to DMA partition measurement of various working conditions
DMA partition metering covers a variety of scenarios such as main network, branch network, community network, old pipe network, etc., and puts forward extremely high requirements for the adaptability of equipment. Guangdong Herbalife plug-in flowmeter, relying on the advantages of "full pipe diameter coverage, no requirements for straight pipe sections, convenient installation and adaptation to complex scenes", perfectly adapts to various working conditions of DMA partition metering and solves the pain point of poor adaptability of traditional equipment.
1. Full pipe diameter coverage, suitable for all kinds of partition scenarios: the diameter coverage is DN50-DN3000, whether it is the main network (DN1000 and above), branch pipe network (DN50-DN300) or community pipe network (DN50-DN100) of DMA partition, it can be perfectly adapted, no need to customize equipment separately, shorten the supply cycle and reduce the equipment purchase cost. For example, a county-level city DMA partition metering renovation project covers 25 partitions with pipe diameters ranging from DN50 to DN800. Guangdong Herbalife plug-in flowmeter is selected. One device is suitable for multiple pipe diameters without additional customization, thus greatly improving procurement efficiency.
2. There is no requirement for straight pipe section, which is suitable for old pipe network scenarios: some areas (such as old residential areas and villages in the city) metered by DMA zones, the water supply pipe network has been built for a long time, the pipeline is aging, the pipe diameter is irregular, and the straight pipe section is insufficient. Traditional pipe section flowmeter has strict requirements for straight pipe section (10 times the pipe diameter upstream and 5 times the pipe diameter downstream), which cannot be suitable for such scenarios, resulting in measurement accuracy deviation. Guangdong Herbalife plug-in flowmeter has no strict requirements on straight pipe sections. Even in parts such as pipe network turns, diameter changes and dense branches, it can be installed perfectly to ensure measurement accuracy and perfectly adapt to the partition measurement requirements of old pipe networks.
3. Easy installation, suitable for complex installation scenarios: Some DMA zone metering devices need to be installed in densely populated areas such as sidewalks, green belts, and older residential neighborhoods, where large construction equipment cannot access the site. Guangdong Herbalife plug-in flowmeter adopts the installation method of opening under pressure and non-stop water supply. It does not need to break pipes, hoisting or welding. It only needs 4-6 ordinary construction personnel and 1 small pressure opening equipment to complete the installation. The construction process does not need to damage the road surface, excavate pipe trenches, have no noise and dust, adapt to various complex installation scenarios, and does not affect the life of surrounding residents and the operation of shops.
4. Multi-material adaptation, covering all kinds of pipe materials: DMA zoned metering pipe network, various pipe materials (steel pipe, cast iron pipe, PE pipe, etc.), Guangdong Herbalife plug-in flowmeter, suitable for pipes of different materials, whether old corroded cast iron pipe or newly built PE pipe, can be perfectly installed without separate adjustment of equipment, greatly improving the adaptability and practicability of the equipment.
(II) high-precision metering: accurate and traceable data to ensure accurate leakage rate accounting
The core requirement of DMA partition measurement is "accurate accounting leakage rate", the accuracy of flow data directly determines the accuracy of leakage rate accounting, but also determines the effect of leakage detection. Guangdong Herbalife plug-in flowmeter has the advantages of high precision and high stability, ensuring accurate traceability of flow data and providing reliable data support for leakage rate accounting.
1. High-precision measurement, meeting the requirements of zoning measurement: the measurement accuracy reaches 0.5 grade, the repeatability error is less than or equal to 0.2, which conforms to national and industrial standards such as "Leakage Control and Evaluation Standard for Urban Water Supply Network" and "Technical Conditions for Water Measurement Equipment". It can accurately measure instantaneous flow, cumulative flow, flow rate and other data, whether it is low flow rate (such as low water trough at night) or high flow rate (such as peak water consumption during the day), can maintain stable measurement accuracy and ensure the accuracy of leakage rate accounting. For example, during the low water consumption period at night, the regional water flow rate is very small, and the leakage flow rate is high. Plug-in flowmeter can accurately capture small flow changes, accurately calculate the leakage rate, and help operation and maintenance personnel to quickly locate the leakage point.
2. High stability operation to avoid data deviation: the equipment adopts advanced signal processing technology and has strong anti-interference ability, which can effectively resist the influence of pipeline vibration, electromagnetic interference, water quality change, temperature change and other factors on the measurement data. Long-term operation without drift ensures the stability and reliability of flow data. DMA partition metering equipment needs long-term outdoor operation, complex working conditions easily lead to traditional equipment measurement deviation, and plug-in flowmeter, the failure rate is less than 0.5/year, long-term stable operation, to avoid the flow data deviation caused by equipment failure, to ensure the continuity of leakage rate accounting.
3. The data can be traced back to meet the audit and assessment requirements: the equipment has a powerful data storage function, can store flow data for more than one year, supports data export (Excel, PDF and other formats) and automatic generation of reports (leakage rate reports, flow trend reports, etc.), facilitates municipal water supply companies to carry out leakage rate accounting, financial audit and superior assessment, and ensures that the data are traceable and verifiable. Additionally, the device supports data resending; even in the event of a brief network outage, no data is lost, and transmission resumes automatically once connectivity is restored, ensuring data integrity.
4. Tiny flow can be measured to capture hidden leakage: hidden leakage (such as tiny pipeline leakage) is the difficulty of DMA partition metering control, such leakage flow is small, difficult to find, traditional equipment can not accurately capture. Guangdong Herbalife plug-in flowmeter, with a minimum measurable flow rate ≤ 0.01 m/s, can accurately capture small flow changes, detect hidden leakage in time, help municipal water supply companies to realize all-round control of "dominant leakage and hidden leakage", and further reduce the leakage rate.
(III) information advantages: real-time remote transmission, to achieve DMA partition metering closed-loop management
The core of DMA partition metering is "data-driven and closed-loop management", which requires metering equipment to upload real-time flow data to the intelligent water platform to realize real-time data monitoring, abnormal alarm, leakage detection, and closed-loop operation and maintenance management. Guangdong Herbalife plug-in flowmeter has perfect information function, can seamlessly connect DMA partition metering system, realize real-time remote data transmission and closed-loop management, and crack the pain point of unstable data transmission of traditional equipment.
1. Multi-communication mode, suitable for various network scenarios: the device has built-in advanced remote transmission module, supports 4G, NB-IoT, RS485, MODBUS and other communication modes, and can be flexibly selected according to the actual scenarios of DMA partition (such as remote areas, urban areas and underground). Among them, the NB-IoT communication mode does not require wiring and has low power consumption, and is suitable for remote areas, buried underground and other scenes without power supply and network wiring. 4G communication mode has wide coverage and fast transmission speed, and is suitable for urban areas requiring real-time transmission of large amounts of data. RS485 communication mode is suitable for short-distance data transmission and is suitable for cell partition metering scenarios. Adaptation to multiple communication methods ensures real-time, stable data transmission across various scenarios.
2. Real-time data remote transmission to realize dynamic monitoring: the equipment can upload instantaneous flow, cumulative flow, flow rate, equipment operation status and other data to the intelligent water platform and DMA partition metering system in real time. Managers can check the flow data of each partition in real time through computers and mobile phone APP, master the water use rules and leakage of each partition, and realize dynamic monitoring of partition metering without on-site duty, greatly improve management efficiency.
3. Abnormal alarm to quickly find hidden dangers of leakage: the equipment has self-diagnosis and abnormal alarm functions. When abnormal flow data (such as sudden increase in flow, sudden decrease in flow and equipment failure) are detected, an alarm signal will be sent out in time, and the alarm information (abnormal type, occurrence time and specific location) will be uploaded to the management platform and pushed to the mobile phone of the management personnel. The management personnel can respond quickly and accurately, timely discover problems such as pipe network leakage and illegal water use, realize early detection and early treatment of hidden dangers of leakage, and avoid the expansion of leakage losses.
4. Seamless system integration for closed-loop management: The device supports common communication protocols such as MODBUS, enabling seamless connectivity with the municipal water supply company’s existing smart water platform, DMA zoning metering system, and pipeline network dispatch system. No additional modifications to the existing systems are required, achieving interconnectedness of flow data, alarm information, and operation & maintenance records. Based on the platform data, managers can formulate leakage investigation plans, arrange operation and maintenance tasks, update operation and maintenance records in real time after operation and maintenance, and realize the closed-loop management of "monitoring-alarm-investigation-operation and maintenance-resumption" of DMA partition measurement.
(IV) operation and maintenance advantages: no water shutdown operation and maintenance, reduce the burden and increase efficiency, and fit the partition metering operation and maintenance scenario.
DMA partition metering equipment has a large number, wide coverage, and is mostly installed in outdoor, underground and other complex scenes, operation and maintenance workload is large, difficult, traditional equipment operation and maintenance needs to stop water, affecting people's livelihood and water supply stability, is the core operation and maintenance pain point faced by municipal water supply companies. Herbalife Guangdong’s plug-and‑play flow meters, designed around the principles of “no water shut‑off required, easy operation and maintenance, and low failure rates,” significantly reduce O&M workload, improve operational efficiency, and align with the O&M requirements of DMA‑based metering.
1. Online plug‑in maintenance, no water shut‑off or meter removal required: The device’s sensor probe features an online plug‑in design, so maintenance can be performed without shutting off the water supply, disconnecting pipes, or removing the meter. Simply use a dedicated tool to pull out the probe to clean, calibrate, or replace it. The process is quick and straightforward; servicing a single unit takes no more than 30 minutes, with no disruption to normal pipeline flow or nearby users’ water supply, completely eliminating the inconvenience of water interruptions associated with traditional equipment maintenance. For example, in a DMA partition metering project, some equipment is installed at the gate of the residential area, and the maintenance of traditional equipment needs to stop water for more than one day, causing residents' complaints. With plug-and-play flowmeter, the operation and maintenance personnel can complete the maintenance in 30 minutes without stopping water supply, which not only reduces the workload of operation and maintenance, but also avoids complaints about people's livelihood.
2. Remote intelligent operation and maintenance to reduce labor cost: the equipment has built-in remote diagnosis and remote calibration functions. Operation and maintenance personnel can monitor the operation status (voltage, current, fault information, etc.) of each equipment in real time through the intelligent water supply platform, remotely complete equipment calibration, parameter setting and fault investigation, without on-site operation, and greatly reduce the on-site workload of operation and maintenance personnel, especially suitable for remote areas, underground, buried and other difficult to reach installation scenarios, reduce the operation risk and labor costs of operation and maintenance personnel.
3. High protection and low failure rate, reducing maintenance frequency: The equipment achieves an overall IP68 protection rating, and the sensor probe also features IP68 protection. It can withstand harsh conditions such as humidity, underground environments, burial, and corrosive settings, offering exceptional resistance to water, dust, impact, and corrosion. With long-term operation free of failures and a failure rate below 0.5% per year, it significantly reduces maintenance frequency while lowering maintenance workload and costs. Compared with the 1%-2% annual failure rate of traditional equipment, plug-in flowmeter can reduce the number of operation and maintenance by more than half, allowing operation and maintenance personnel to devote more energy to core work such as leakage investigation and pipe network maintenance.
4. Long service life and reduced secondary purchase cost: the equipment adopts 316L stainless steel probe PTFE anti-corrosion lining material, which is anti-aging, anti-corrosion and anti-scaling, and adapts to the complex water quality conditions of municipal water supply network. The overall service life of the equipment is more than 10 years, and the service life of the sensor probe is ≥ 5 years. Compared with the service life of traditional equipment of 5-8 years, it can reduce at least 2 times of equipment replacement and greatly reduce secondary purchase cost and operation and maintenance cost, the long-term operation and maintenance needs of DMA partition metering are met.
(V) cost advantage: full-cycle cost savings, reduce the comprehensive cost of DMA partition measurement transformation.
DMA partition measurement transformation project, equipment purchase, construction, operation and maintenance and other links of high cost, how to control the project cost, is one of the core considerations of municipal water supply company procurement decision-making. Guangdong Herbalife plug-in flowmeter, from the equipment purchase, construction, operation and maintenance of the three core links, all-round for municipal water supply companies to reduce the comprehensive cost, compared with traditional equipment, the comprehensive cost can be reduced by 30%-60%, in line with the DMA partition measurement transformation of the cost control needs.
1. Low equipment acquisition cost and excellent cost-effectiveness: The plug‑and‑measure flowmeter features a plug‑in design, which significantly reduces material usage compared with conventional in‑line flowmeters—especially for large diameters. Its unit price is only 30%–50% of that of a conventional in‑line meter with the same nominal diameter, and the cost advantage becomes more pronounced as the pipe size increases. For example, the unit price of the traditional pipe section flowmeter of DN300 specification is about 80000 yuan, while the unit price of Guangdong Herbalife plug-in flowmeter is only about 30000 yuan, which directly saves 62.5 percent of the equipment purchase cost. For small and medium-sized equipment widely used in DMA zoning metering, batch purchase can further enjoy preferential treatment and greatly reduce the initial capital investment.
At the same time, Guangdong Herbalife, as the source manufacturer, omits the intermediate distributor link and directly connects with the municipal water supply purchaser. It can provide more advantageous batch purchase price according to the project collection quantity and customization requirements, further reduce the equipment purchase cost, and allow the purchaser to purchase high-quality and high-performance flow metering equipment with less funds.
2. Lower construction costs and elimination of hidden losses: Conventional segmental pipeline flow meters require pipe cutting, lifting, welding, trenching, and road surface damage, resulting in long construction cycles, high labor demands, substantial equipment investment, and persistently high costs. In contrast, Guangdong Herbalife’s plug‑and‑measure flow meter features a simplified installation process that eliminates the need for heavy construction equipment, trenching, or welding. It requires only 4–6 general workers and one compact pressurized tapping unit, with per‑unit installation costs amounting to roughly 20% of those for traditional systems.
More importantly, the plug-and‑measure flow meter enables continuous‑flow construction without shutting off the water supply, completely eliminating hidden costs such as revenue loss, corporate compensation, and handling of public complaints caused by water outages. Taking a DMA zoning metering renovation project as an example, traditional equipment was used for construction. A single water cut-off was carried out for one day, affecting two surrounding communities. The revenue loss was about 150000 yuan and the total hidden loss was 200000 yuan. However, the plug-and-measure flowmeter is used without any water cut-off loss, the construction cost alone is saved by 80%, and the comprehensive hidden cost is almost zero.
3. The operation and maintenance cost is low, and the long-term burden is greatly reduced: DMA partition metering equipment is large, and the operation and maintenance cost is an important burden for long-term operation. When maintaining the traditional pipe-section flowmeter, it is necessary to stop water supply, pipe disconnection and meter disassembly again, which requires heavy operation and maintenance workload and high cost, and the loss caused by maintenance and water supply shutdown every year cannot be underestimated. However, Guangdong Herbalife plug-in flowmeter does not stop water online maintenance, reducing operation and maintenance workload by more than 70% and operation and maintenance cost by 60%.
In addition, the equipment has a long service life and low failure rate, which greatly reduces the frequency of equipment replacement and operation and maintenance, and further reduces operation and maintenance costs and secondary procurement costs. For example, a municipal water supply company DMA zoning metering renovation project, the use of plug-and-measure flowmeter, the annual operation and maintenance cost of only more than 30000 yuan, compared to the traditional equipment of more than 80000 yuan per year operation and maintenance costs, saving 62.5, in the long run, the cost savings are more significant.
(VI) compliance advantages: complete qualifications, in line with standards, suitable for government procurement requirements
DMA zoning measurement transformation is mostly government centralized procurement and public bidding projects, which have strict requirements on the qualification certification and compliance of equipment. Equipment with incomplete qualification and non-conforming standards cannot participate in bidding or pass acceptance. Herbalife Guangdong’s plug‑and‑measure insertion electromagnetic flowmeter is fully certified and complies with relevant national and industry standards, perfectly meeting the compliance requirements of government procurement. It helps buyers mitigate procurement risks and ensures that projects pass acceptance and audits smoothly.
1. Complete qualifications and can directly participate in bidding and acceptance: the equipment has passed the national measuring instrument type approval certificate (CPA), the verification report of the third-party authority, explosion-proof certification (Exd II BT4), IP68 waterproof and dustproof certification, CE certification, ROHS certification and other qualification certifications. The qualification documents are complete and verifiable, and can directly meet the bidding and acceptance requirements of DMA partition measurement transformation projects, avoid procurement risks due to qualification issues.
2. Comply with national industry standards to ensure compliance: the equipment fully complies with relevant national and industry standards such as "Leakage Control and Evaluation Standard for Urban Water Supply Network" (GB/T 51089-2016), "Technical Conditions for Water Measurement Equipment" (SL/T 426-2021), "Electromagnetic Flowmeter" (GB/T 18659-2018), etc, measurement accuracy, protection level, material requirements, service life, data transmission and other performance indicators, all meet the technical requirements of DMA partition measurement transformation, can successfully pass the assessment and audit of the superior department, to ensure that the project compliance standards.
3. Complete technical data and acceptance support can be provided: Guangdong Herbalife can provide the purchaser with complete technical data, including equipment instructions, qualification certification documents, verification reports, installation and commissioning manuals, data transmission agreements, etc., and at the same time provide professional acceptance guidance services to assist the purchaser to complete the project acceptance, ensure the smooth completion and commissioning of the project, and avoid project delays caused by incomplete technical data and unqualified acceptance.
4. Guangdong Herbalife DMA zoning metering exclusive solution (landing can be copied)
Guangdong Herbalife not only provides high-quality plug-and-measure flowmeters, but also combines the landing requirements of DMA zoning metering to create an integrated exclusive solution of "equipment scheme service". From early-stage zoning planning, equipment selection, mid-stage installation and debugging, system docking, to late-stage operation and maintenance management and data interpretation, the whole process is escorted to ensure that DMA zoning metering transformation is quickly landed, efficient and effective, and the scheme can be replicated and popularized, adapt to DMA partition metering transformation projects of different sizes and scenarios.
Pre-(I) stage: exclusive consultation, zoning planning, equipment selection
1. Exclusive consulting services: arrange professional DMA zoning measurement technical consultants to provide one-on-one consulting services for purchasers, interpret policy requirements, analyze zoning measurement landing difficulties, and provide personalized solution suggestions in combination with the actual situation of municipal water supply network (network distribution, pipe diameter specifications, water quality conditions, leakage status).
2. Zoning planning service: according to the actual situation of the water supply network, assist the purchaser to carry out DMA zoning planning, reasonably divide independent measurement areas (combined with network layout, water use scale and geographical environment), and specify the measurement points, pipe diameter specifications and equipment quantity of each partition, so as to ensure scientific and reasonable zoning planning, improve leakage control effect and avoid cost waste caused by blind zoning.
3. Equipment selection service: According to the scene requirements (pipe diameter, installation environment and communication conditions) of each partition, the purchaser is accurately selected, the suitable plug-and-play flowmeter model is recommended, and the equipment sampling and testing service is provided, so that the purchaser can intuitively understand the performance advantages of the equipment such as measurement accuracy, installation convenience and data transmission stability, ensure that the equipment selection meets the project requirements and avoid the risks caused by improper selection.
Mid-(II): installation and commissioning system docking personnel training
1. On-site installation and debugging service: arrange a professional installation and debugging team to provide installation and debugging services for the purchaser on-site, operate in strict accordance with the construction specifications, adopt the installation method of opening holes under pressure and non-stop water supply to ensure the installation quality and construction safety, and shorten the construction period to the greatest extent; After the installation is completed, the equipment shall be fully debugged to ensure accurate measurement, stable data transmission and normal abnormal alarm, at the same time, the docking of the equipment with DMA partition metering system and intelligent water platform is completed.
2. System docking service: Arrange professional information engineers to assist the purchaser to complete the docking and debugging of the plug-and-measure flowmeter with the existing DMA partition metering system, intelligent water supply platform and pipe network dispatching system, so as to ensure real-time data upload and seamless compatibility without additional technical input from the purchaser; According to the requirements of the purchaser, customized data reports (leakage rate reports, flow trend reports, etc.) are convenient for managers to view and analyze the data.
3. Personnel training service: Provide on-site operation training for management personnel and operation and maintenance personnel of the purchaser, including equipment operation, data viewing, troubleshooting, daily maintenance, etc., to help them quickly master equipment use and maintenance skills, improve operation and maintenance capabilities, ensure the normal operation of DMA partition metering system, and realize closed-loop management.
Late (III): Interpretation, Upgrade and Optimization of Operation and Maintenance Support Data
1. Full after-sales operation and maintenance service: the warranty period is ≥ 2 years, and the purchaser is provided with equipment maintenance and parts replacement services free of charge during the warranty period without any hidden expenses; Outside the warranty period, lifelong technical support and supply of spare parts are provided, and the price of spare parts is favorable to ensure long-term stable operation of the equipment. Establish a dedicated after-sales docking group, arrange professional after-sales engineers, and respond to the after-sales demand of the purchaser 24 hours, 24 hours in the province and 48 hours outside the province to deal with the fault, to ensure that the equipment failure can be solved in time, does not affect the normal operation of DMA partition metering.
2. Data interpretation service: regularly provide data interpretation service for the purchaser, analyze the flow data and leakage rate data of each partition, identify abnormal leakage areas, and provide leakage investigation suggestions; Combined with long-term data accumulation, analyze the regional water use law, provide accurate data support for pipe network scheduling and water distribution, and help the purchaser to further optimize the leakage control scheme and reduce the leakage rate.
3. Upgrade and optimization service: With the deepening of smart water construction and the improvement of policy requirements, provide the purchaser with upgrade and optimization service of equipment and systems, upgrade the information function and data transmission capability of the equipment, optimize the DMA partition metering scheme, ensure that the scheme always meets the policy requirements and the actual needs of the purchaser, and realize the continuous optimization and improvement of DMA partition metering.
Exclusive Landing Case of 5. DMA Partition Metrology Transformation (Real)
Guangdong Herbalife plug-in electromagnetic flowmeter has been successfully applied to DMA zoning metering renovation projects in many provinces and cities across the country, covering different scales such as prefecture-level cities, county-level cities, villages and towns, covering various scenarios such as old pipe networks, new pipe networks, industrial parks, residential areas, etc. Relying on the core advantages of "high adaptability, high precision, real-time remote transmission, no water cut-off operation and maintenance, and low cost", it helps municipal water supply companies successfully implement DMA zoning metering, significantly reduce the leakage rate, has been highly recognized and praised by local purchasers, the following are 3 typical landing cases for the purchaser's reference (can be on-site inspection, verification).
Case 1: DMA partition measurement transformation project in a prefecture-level city (28 partitions, DN50-DN1000)
1. Project Background: This prefecture-level city has an extensive water supply network with a high proportion of aging infrastructure. Leakage rates stand at 11.8%, exceeding the national target of 9%. There is an urgent need to implement DMA-based metering and zoning upgrades to achieve precise leak control and reduce leakage rates. The project is divided into 28 independent metering areas, covering the main network, branch network and residential community network, with pipe diameters ranging from DN50 to DN1000. Some areas have aging pipe networks, insufficient straight pipe sections and large-scale equipment unable to enter the site. The equipment is required to have high adaptability, high precision, real-time remote transmission and no water shutdown operation and maintenance functions. At the same time, the project cost needs to be controlled to ensure the smooth acceptance of the project.
2. Procurement pain points: traditional pipe section flowmeter has poor adaptability and cannot adapt to old pipe networks and complex installation scenarios; Some plug-in flowmeters have low measurement accuracy and unstable data transmission, which cannot meet the leakage rate accounting requirements. The project has a large number of equipment and a large amount of operation and maintenance workload, so the operation and maintenance costs need to be reduced. The equipment must have complete qualifications to meet the compliance requirements of government procurement.
3. Solution: After multi-party comparison and sampling tests, the purchaser finally selected Guangdong Herbalife plug-in electromagnetic flowmeter, purchased a total of 96 sets (suitable for DN50-DN1000 pipe diameter), and adopted Guangdong Herbalife DMA partition metering exclusive solution, including preliminary partition planning, medium-term installation and debugging system docking, and later operation and maintenance guarantee. The equipment adopts the installation mode of opening with pressure and non-stop water supply to adapt to various scenes. Support 4G NB-IoT dual communication mode to ensure real-time and stable data transmission; Seamless docking procurement reflects the existing intelligent water platform to realize real-time data monitoring, abnormal alarm and report generation.
4. Application effect: The project only took 45 days to complete the installation, debugging and system docking of all equipment, with no water cut-off, no nuisance and no complaints about people's livelihood. The measurement accuracy of the equipment is stable (level 0.5), and there is no loss or delay in data transmission. Managers can check the flow data and leakage rate data of each partition in real time through the platform. Through the abnormal alarm function, a total of 32 hidden leakage points have been found, leakage investigation efficiency increased by 85%; After the renovation, the leakage rate of the city's water supply network dropped from 11.8 to 7.6, successfully achieving the national control target and reducing leakage losses by more than 2 million yuan per year. Compared with traditional equipment, the overall cost of the project is reduced by 52%, including 48% in equipment purchase cost and 60% in operation and maintenance cost. It has won recognition and financial subsidy support from superior departments, and 60 additional units will be purchased subsequently, it is used for newly added partition metering transformation.
Case 2: DMA zoning measurement transformation project of a county-level city (25 zoning, DN50-DN800)
1. Project background: The water supply network in this county-level city is not clearly partitioned, the leakage point is difficult to locate, and the leakage rate is 12.3. It is urgent to promote DMA partition measurement transformation to realize "partition control and accurate leakage". The project is divided into 25 independent measurement areas, covering 18 residential areas and 7 industrial parks. The pipe diameters range from DN50 to DN800. Some residential areas are old residential areas. The pipe network is aging, the straight pipe section is insufficient, and the installation scene is complicated. It requires convenient installation of equipment, no need to damage the road surface, real-time remote transmission, and control of project cost.
2. Procurement pain points: the installation scene in the old residential area is complicated, large equipment cannot enter the site, and traditional equipment cannot be installed; The number of equipment is large, the coverage is wide, and the operation and maintenance workload is large, so the operation and maintenance cost needs to be reduced. The equipment needs to be adapted to a variety of pipe diameters without separate customization. Data needs to be uploaded to the smart water platform in real time to realize closed-loop management.
3. Solution: Guangdong Herbalife plug-in electromagnetic flowmeter (86 sets, DN50-DN800 sets) is selected, and the installation method with pressure opening and excavation-free is adopted. It does not need to damage the road surface or large-scale equipment, and is suitable for various scenes such as old residential areas and industrial parks. The equipment supports NB-IoT remote transmission mode, does not need wiring, and is suitable for remote areas and residential scenes. Seamless docking procurement reflects the existing intelligent water platform, realize real-time upload of traffic data, abnormal alarm, automatic accounting of leakage rate, and provide full after-sales operation and maintenance services to reduce the workload of operation and maintenance.
4. Application effect: 86 sets of equipment were installed and debugged in only 30 days. The construction process was free of noise, dust and disturbance, and was unanimously recognized by surrounding residents and enterprises. The equipment has strong adaptability, and can maintain stable measurement accuracy whether it is irregular pipe network in old residential areas or complex working conditions in industrial parks. Through DMA zoning metering system, the leakage area can be accurately positioned, and the leakage detection efficiency can be improved by 80%, after the renovation, the leakage rate dropped from 12.3 to 7.9, and the leakage loss was reduced by more than 1.2 million yuan per year. The equipment is convenient for operation and maintenance, free of water supply and online maintenance, and the annual operation and maintenance cost only needs 28000 yuan, which is 65% less than that of traditional equipment. Data can be traced back and reports can be automatically generated, which can successfully pass the assessment and audit of superior departments.
Case 3: DMA zoning measurement transformation project of a township (12 zoning, DN50-DN300)
1. Project background: The township water supply network covers a wide range of areas, the layout is scattered, some areas are remote villages, no network wiring, no stable power supply, leakage rate of 13.5, it is urgent to promote DMA zoning measurement transformation, to achieve leakage rate control standards. The project is divided into 12 independent metering areas, the pipe diameter is mainly DN50-DN300, the installation scene covers the village main road, the field, the requirements of equipment installation is convenient, low power consumption, no wiring, at the same time need to have the advantages of high-precision metering and low operation and maintenance costs.
2. Procurement pain points: remote villages have no network wiring and stable power supply, and traditional equipment cannot realize remote data transmission; The installation scene is scattered, the operation and maintenance is difficult and the cost is high. The township financial budget is limited, and the cost of equipment purchase and construction needs to be controlled. Equipment needs to have high stability and adapt to harsh outdoor conditions.
3. Solution: Guangdong Herbalife plug-in electromagnetic flowmeter (42 sets, DN50-DN300 sets) is selected, which adopts NB-IoT remote transmission mode, does not need wiring, has low power consumption, and is suitable for the scene without network wiring in remote villages. The equipment has dual mode of battery power supply and mains power supply, which is suitable for the scene without stable power supply. The installation method with pressure hole and no water cut is adopted, which is convenient to install and does not require large equipment, thus reduces construction cost; equipment protection grade IP68, adapt to outdoor harsh conditions, low failure rate, reduce the workload of operation and maintenance.
4. Application effect: 42 sets of equipment were fully installed and debugged in 15 days, with high construction efficiency and low cost. Equipment data transmission is stable, even in remote villages, flow data can be uploaded to the smart water platform in real time; Through DMA partition measurement, 18 leakage points were accurately located, the leakage investigation efficiency was increased by 75%, and the leakage rate after renovation was reduced from 13.5 to 8.3, thus successfully achieving the national target; the operation and maintenance of the equipment is convenient, and the annual operation and maintenance cost is only 12000 yuan, which is 70% less than that of traditional equipment. The equipment is stable in operation with a failure rate of 0. It has won unanimous favorable comments from the township government and villagers and has become a demonstration project for DMA zoning measurement transformation in villages and towns.
Selection Guide for Procurement of 6. DMA Partition Metrological Transformation (can be directly written into bidding documents)
For DMA partition metering renovation projects (especially government centralized procurement and public bidding projects), equipment selection directly determines the landing effect and cost control of the project. Combining the core requirements and policy requirements of DMA partition metering and the performance advantages of Guangdong Herbalife plug-and-measure flowmeter, the exclusive selection guide is sorted out, and the purchaser can directly write into the bidding documents to avoid procurement risks, to ensure the procurement of "high adaptation, high precision, remote transmission, easy operation and maintenance, low cost, compliance" flow metering equipment, to help DMA partition metering transformation smoothly landing.
1. Measurement principle: electromagnetic induction principle, supports plug-in installation, has the core function of "plug-in and test", does not need to break pipes, does not stop water supply, can be put into use immediately after installation, adapts DMA partition to measure various complex installation scenarios, and eliminates losses and nuisance problems caused by water cut-off transformation.
2. Adaptability requirements: the caliber range is ≥ DN50-DN3000, which can be adapted to various scenes such as DMA partition metering main pipe network, branch pipe network, residential pipe network, etc. There are no strict requirements for straight pipe sections, and they are suitable for scenes such as old pipe networks, pipe turns, diameter reduction, etc. Adapt to various pipeline materials such as steel pipes, cast iron pipes, PE pipes, etc. The installation method is plug-in, using pressure drilling technology, without large construction equipment, excavation and welding, adapt to complex installation scenarios such as densely populated areas and remote areas.
3. Accuracy grade: measurement accuracy ≤ 0.5, repeatability error ≤ 0.2, meeting the requirements of "Leakage Control and Evaluation Standard for Urban Water Supply Network" (GB/T 51089-2016) and "Technical Conditions for Water Quantity Measurement Equipment" (SL/T 426-2021); The minimum measurable flow rate is ≤ 0.01 m/s, which can accurately capture small flow changes and meet the requirements of hidden leakage investigation. Long-term operation without drift, failure rate ≤ 0.5%/year.
4. Informatization function: supports 4G, NB-IoT, RS485, MODBUS and other communication modes, and can be flexibly selected (suitable for remote areas without network wiring scenes); It has the functions of real-time data remote transmission, data storage (≥ 1 year) and automatic report generation (leakage rate report, traffic trend report, etc.); With self-diagnosis and abnormal alarm functions, alarm information can be uploaded to the management platform in real time to support mobile phone APP push; support remote diagnosis, remote calibration function, to achieve intelligent operation and maintenance; seamless docking DMA partition metering system, intelligent water platform, no additional transformation.
5. Protection and material: the overall protection level of the equipment is ≥ IP68, and the protection level of the sensor probe is ≥ IP68, which is suitable for harsh working conditions such as outdoor, underground, buried, corrosion, etc. The sensor probe is made of 316L stainless steel, and the lining is made of PTFE (polytetrafluoroethylene) anti-corrosion material, which is anti-aging, anti-corrosion and anti-scaling. The equipment shell is made of stainless steel, waterproof, dustproof, dustproof, anti-impact and suitable for long-proof; support battery-powered mains power supply dual-mode (suitable for remote areas without stable power supply scenarios).
6. Operation and maintenance requirements: support online plug-in maintenance, no need to cut off water, no need to disassemble meters, and maintenance time ≤ 30 minutes/set; The overall service life of the equipment is ≥ 10 years, and the service life of the sensor probe is ≥ 5 years. Support remote operation and maintenance, which can remotely complete parameter setting, troubleshooting and calibration, and reduce the workload of on-site operation and maintenance. Manufacturers provide perfect operation and maintenance services and timely response.
7. Qualification requirements: Possess relevant qualifications such as national measuring instrument type approval certificate (CPA), third-party authority verification report, explosion-proof certification (Exd II BT4), IP68 waterproof and dustproof certification, CE certification, ROHS certification, etc. Comply with relevant national and industry standards and be able to successfully pass bidding, acceptance and audit; The manufacturer has the capability of DMA zoning measurement scheme design and system docking, and can provide complete technical data.
8. After-sales requirements: the manufacturer is the source manufacturer, has a perfect after-sales service system, and has service outlets in the province; Provide on-site guidance for installation, debugging, system docking and personnel training services; Warranty period ≥ 2 years, free maintenance and replacement of parts during warranty period without any hidden costs; Provide lifelong technical support and spare parts supply, response time ≤ 24 hours (within the province) and ≤ 48 hours (outside the province); provide value-added services such as data interpretation and scheme upgrading and optimization.
9. Cost Requirements: The total equipment cost (equipment procurement + installation + operation & maintenance + water supply interruption losses) must be at least 30% lower than that of conventional segment-type flow meters; support bulk-purchase price negotiation and provide reasonable pricing and payment terms; furnish a detailed cost accounting plan and supporting case studies to ensure cost control and eliminate the risk of secondary investments.
Why is Guangdong Herbalife Plug-in Flowmeter Preferred for DMA Partition Measurement Transformation in 7.
Currently, DMA zoning metering upgrades have entered a new phase characterized by scale, precision, and intelligence. Selecting flow‑metering equipment that is well‑suited to the specific application, reliably performs, remains cost‑controlled, and is backed by comprehensive service is key to successfully implementing DMA zoning metering. Herbalife Guangdong’s plug‑and‑measure insertion electromagnetic flowmeter, with its seven core advantages—“scenario adaptation, precise measurement, intelligent data, convenient operation and maintenance, controllable costs, full compliance, and professional service”—has become the preferred product for DMA district metering upgrade projects nationwide. The key reasons are as follows:
1. The scene adaptability is strong, and the landing difficulties are solved: full pipe diameter coverage, no requirements for straight pipe sections, convenient installation, adaptation to DMA partition metering main pipe network, branch pipe network, old pipe network, remote areas and other scenes, solving the pain points of poor adaptability and difficult installation of traditional equipment, and ensuring the smooth progress of the project.
2. The measurement is accurate and traceable, and the leakage control effect is guaranteed: 0.5-level high-precision measurement, small flow can be measured, data is stable and free of drift, data can be stored for more than one year, automatic generation of reports is supported, accurate leakage control is ensured, and the national leakage rate target is reached.
3. Data intelligence and efficiency enable closed-loop management: supports multiple communication protocols, enables real-time remote data transmission, provides timely anomaly alerts, and seamlessly integrates with the DMA zoning metering system, achieving a closed-loop workflow of “monitoring–alerting–troubleshooting–operations & maintenance–post‑mortem analysis” to enhance operational efficiency.
4. Convenient and worry-free operation and maintenance, reducing operation burden: online maintenance without water shutdown, remote intelligent operation and maintenance, high protection, low failure, long service life, greatly reducing operation and maintenance workload and operation and maintenance costs, and meeting the operation and maintenance requirements of DMA partition metering equipment with many and wide coverage.
5. Cost controllable and cost-effective: reduce the comprehensive cost from the three core links of equipment purchase, construction and operation and maintenance, save 30%-60% compared with traditional equipment, provide direct supply from source manufacturers, and enjoy more preferential treatment for bulk purchase, which meets the cost control needs of municipal water supply companies.
6. Complete compliance and avoid procurement risks: complete qualifications, in line with national and industry standards, can directly participate in bidding and acceptance, manufacturers provide complete technical information and acceptance support to help purchasers avoid procurement risks and acceptance risks.
7. Professional service and full escort: provide all-round service of "pre-consultation and zoning planning equipment selection, mid-term installation and debugging system docking with post-operation and maintenance guarantee data interpretation". The response is timely, professional and efficient. As a source manufacturer, it can provide personalized solutions and value-added services to ensure the rapid landing and efficient effect of DMA zoning metering transformation.
8. Strength guarantee, cases can be copied: deep cultivation in the field of intelligent water metering for many years, with independent research and development strength, modern production base and professional technology and service team, controllable product quality and leading technology; Hundreds of DMA partition metering cases across the country have landed, with rich actual combat experience, and the scheme can be copied and popularized, which can accurately solve all kinds of pain points of DMA partition metering landing.
8. contact information (exclusive docking of DMA partition metering)
Guangdong Herbalife Smart Water Co., Ltd. focuses on DMA zoning measurement and transformation of flow measurement solutions, and wholeheartedly provides professional products and services to municipal water supply companies, procurement leaders and chief engineers in various regions. With the core advantages and integrated solutions of plug-in electromagnetic flowmeters, it helps municipal water supply companies in various regions to successfully realize DMA zoning measurement landing, accurately control leakage, reduce costs and increase efficiency, and meet compliance standards!
Welcome to call for consultation, on-the-spot investigation and sampling test. We will customize a dedicated DMA zoning metering solution for you one by one. According to the actual situation and budget requirements of your pipe network, we will recommend the appropriate equipment model to help you complete the whole process of project planning, procurement and landing, so that you can purchase at ease, use at ease and operate at ease!
Exclusive Docking Person: Guangdong Herbalife Smart Water
Contact number: 13926998050 (WeChat with the same number)
Company address: Building 1, No. 1099 jinzhou Road, Tangjiawan Town, High-tech Zone, Zhuhai City, Guangdong Province (on-site inspection of production bases and office places)
Service commitment: 24-hour technical consultation and response, free sampling and testing, free scheme design, free zoning planning, on-site installation and debugging, life-long technical support, and full escort to help your DMA zoning measurement transformation project to land smoothly and take effect efficiently!
9. epilogue
DMA zoning measurement is the key path for municipal water supply companies to achieve leakage rate control, fine operation and compliance, while flow measurement equipment is the "core cornerstone" of DMA zoning measurement transformation ". Choosing a metering device that adapts to the scene, is accurate and reliable, cost-controllable, and has perfect service can make DMA partition metering transformation "get twice the result with half the effort" and quickly achieve the goals of reducing leakage rate, improving operational efficiency, and reducing costs.
Guangdong Herbalife plug-in electromagnetic flowmeter is supported by the core technology of "plug-in" and deeply meets the core requirements of DMA zoning metering. It thoroughly solves all kinds of pain points of DMA zoning metering landing from seven aspects of scene adaptation, accurate metering, data intelligence, convenient operation and maintenance, cost control, compliance and service guarantee, and provides a stable, reliable and cost-effective flow metering base for municipal water supply companies.
From the large-scale zoning measurement of prefecture-level cities to the precise control of county-level cities and villages and towns, Guangdong Herbalife has always moved forward side by side with municipal water supply companies, using high-quality products, professional technology and perfect services to help municipal water supply companies in various regions smoothly promote DMA zoning measurement transformation, realize the goals of "precise measurement, precise leakage control, cost reduction and efficiency enhancement, and intelligent operation and maintenance", and promote the high-quality development of urban water supply network, escort for the well-being of the people.

- Buy flowmeter, first look at the site conditions! 2026 Depth Comparison of Domestic and Imported Brands of Electromagnetic Flowmeter Manufacturers
- 2026 domestic electromagnetic flow manufacturers recommended: top ten brands of intelligent flow meter recommended reasons
- How to choose imported flat electromagnetic flowmeter? How to choose micro-caliber, conventional flange and plug-in electromagnetic? Recommended by domestic high-quality manufacturers
- Four major brands of electromagnetic flowmeter hard core PK: Herbalife Water, Cloud Meter, E H, Cologne, who is more worthy of choice?
- November 2026 Top Ten Brands of Electromagnetic Flowmeter at Home and Abroad Ranking
- Recommended Top Ten Brands of Electromagnetic Flowmeter in 2026: Reference for Project Selection of Water Treatment, Sewage and Conductive Liquid
- TOP5 Manufacturer's Selection Guide for Food Sanitary Electromagnetic Flowmeter: Material and Connection Mode Check before Purchase
- Cost-effective chemical oxygen demand water quality online monitor manufacturers contact information
- How to choose the integrated electromagnetic water meter? Domestic high-quality manufacturers recommendation and selection guide
- Selection of Electromagnetic Flowmeter for Small Diameter Ultra-high Temperature Medium Metering Engineering