DMA Zoning Project: Implementation Plan Recommendation of Equipment Manufacturer-Herbalife Water Supply, Key Project of Water Consumption Monitoring and Measurement
1. Key Project for Water Withdrawal and Use Monitoring and Measurement: Policy Background and Core Requirements for DMA Zoning Construction
Water withdrawal monitoring and metering are fundamental tasks for implementing the rigid water resource constraints system and advancing the development of a water-saving society. In recent years, the state has continuously advanced the development of a water withdrawal monitoring and measurement system, requiring water users, water supply enterprises, and irrigation district management units to establish comprehensive measurement and monitoring systems to enable online monitoring of water withdrawals and data aggregation. DMA分区计量, as an important tool for controlling water leakage in distribution networks and monitoring water intake and usage, is becoming a key focus of infrastructure development for water utilities and industrial park operators.
Core Requirements for Water Withdrawal Monitoring and Measurement Projects
Full coverage of metrology:Achieve full metering coverage at intake points, plant outlet pipelines, regional main inlets, DMA分区 entrances, and user metering points, establishing a comprehensive metering hierarchy.
Online monitoring:Measurement data is collected online and transmitted remotely, integrated into the water intake and usage monitoring and measurement platform, thereby meeting regulatory requirements.
Leakage Control: Identify leakage zones and control network leakage rates through DMA zoning and analysis of nighttime minimum flow.
Data Aggregation and Sharing: Metering data is fed into the higher-level regulatory platform to enable data aggregation, sharing, and analysis.
Long-term stable operation:Measuring equipment must exhibit long-term stability and require minimal maintenance, while being suitable for field conditions such as outdoor environments, high humidity, and unattended operation.
Operational Challenges in the Construction of DMA Zone Projects
Decentralized locations, unattended operation:DMA partition entry points and user metering points are dispersed; some locations lack mains power and wired networks, requiring support for battery power and wireless remote transmission.
High demand for small flow measurement at night: The minimum flow rate at night is the key data for leakage analysis, and the low flow rate measurement ability directly determines the leakage identification effect.
Compact installation space:DMA分区 entrances are often located in pump rooms, pipe shafts, and valve pits; space is tight, and insufficient straight-pipe lengths are a common issue.
Large differences in water qualityWater quality varies significantly across different regions; in some areas, the electrical conductivity is low, so products designed for measuring low conductivity should be selected.
Long-term maintenance-free:The measurement points are widely dispersed, resulting in high maintenance and inspection costs; the equipment must offer long-term zero-point stability and long battery life.
Data Access to the Regulatory Platform:Measurement data must be integrated into the water intake and consumption monitoring and measurement platform and the smart water management platform to meet regulatory and assessment requirements.
2. Overall Architecture of the Implementation Plan for Water Monitoring and Metering in DMA Zones of Herbalife Water Services
Herbalife Water was established in 2012, headquartered in Zhuhai High-tech Zone, is a national high-tech enterprises. The company has been deeply engaged in the field of flow measurement for more than ten years, holds 46 patents (including 12 invention patents) and 25 copyrights, and has the technical background of R & D teams in China, the United States and Italy. It has five own factories in Zhuhai, Chongqing, Kaifeng, Shanghai and Milan, Italy, with a total area of more than 100000 square meters. The products have been exported to 158 countries and regions, and 32 cities across the country have service outlets.
To meet the DMA zoning requirements of key water abstraction and consumption monitoring and metering projects, Conopool Water Services offers an integrated “metering equipment – data acquisition – wireless remote transmission – smart platform” solution that spans primary, secondary, and tertiary zones as well as end‑user meters, enabling online monitoring of water intake and usage, leak detection and analysis, and centralized data aggregation.

Overall Architecture of the Implementation Plan
Hierarchy | Construction Content | Core Products | Functional Positioning |
Perception Layer | Flow measurement, pressure monitoring | MC6100/M6300 Series Electromagnetic Water Meters and Pressure Sensors | Water consumption and water pressure data collection |
Collection Layer | Data Collection and Local Storage | RTU/DTU data acquisition terminal | Multi-channel data acquisition, local storage, protocol conversion |
Transport layer | Wireless/Wired Remote Transmission | NB-IoT/4G wireless remote transmission module | Remote data transmission to the platform |
Platform layer | Leakage Analysis and Data Aggregation | DMA Partition Leakage Analysis Platform | Nighttime minimum flow analysis, leakage alarm, data aggregation |
3. Perception Layer: Metering Equipment Configuration Plan
3.1 Metering Hierarchy Configuration
Measurement level | Metering point | Recommended Products | Caliber | Key Considerations |
一级分区 | Water intake, plant outlet pipe, district main inlet | M6300 series full bore electromagnetic water meter | DN300~DN1000 | High accuracy of ±0.2% to ±0.5%, wide turndown ratio of 1500:1, IP68 rated |
Subpartitioning | Community main entrance, DMA zone entrance | MC6100 series full bore electromagnetic water meter | DN50~DN200 | Low flow rate measurement at 0.05 m/s, 0D0 installation, wireless remote transmission |
三级分区 | Building-wide meter, unit-wide meter | MC6100 series full bore electromagnetic water meter | DN15~DN50 | Minimum 3L/h, 0D0 mounting, battery powered |
User Metering | Tenant-specific metering, resident-specific metering | MC6100 series full bore electromagnetic water meter | DN15~DN25 | Ultra-low flow, low power consumption, NB-IoT remote transmission |
3.2 Core Product 1: MC6100 Series Full-Bore Electromagnetic Water Meter
Applicable scenarios: DMA zone entry points, community main meters, building main meters, and user sub-meters; compact space environments.
Core technical parameters:
Parameters | MC6100 Series Specifications |
Caliber range | DN3、DN4、DN6、DN8、DN10、DN15、DN20、DN32 |
Minimum flow | 3L/h(DN3 up to 1L/h) |
Medium flow velocity | 0.001~10m/s |
Measurement accuracy | Class 0.2, Class 0.3, Class 0.5 |
Lower limit of conductivity | Measured to 0.5 μS/cm |
Electrode material | HC (Hastelloy), 316L, Ta (Tantalum) |
Lining material | PEEK, ceramic, PTFE |
Medium temperature | Up to 180℃ |
Protection rating | IP65 (IP68 optional) |
Communications | RS485 MODBUS RTU (support HART communication), NB-IoT/4G |
Installation Requirements | 0D0 (no straight pipe section required) |
Core Technological Advantages:
- Low-Flow Precision Metering: broadband adaptive excitation AI anti-interference algorithm, stable measurement at low flow rate of 0.05 m/s, measuring range ratio of 1500:1, minimum measurable 3L/h(DN3 up to 1L/h), accurate capture of minimum flow at night.
- Ultra-low conductivity measurement: It can be measured to 0.5 μS/cm, covering all kinds of municipal water supply quality.
- Long-term 0.0 drift: Constant current excitation remanence intelligent compensation, long-term 0.0 drift, 10 years battery life, reduce calibration frequency.
- No straight pipe section required (0D0 installation): Adapt to DMA partition entrance compact space.
- Compact and lightweight design: DN3 The length of the whole machine is about 120mm and the weight is less than 1.5kg.
- Quick response: 40 high-frequency sampling in 1 second to capture sudden flow changes in real time.
- Bidirectional measurement: Supports forward and reverse flow measurement.
- Multiple modes of communicationSupports RS485 (Modbus RTU), HART, and NB-IoT/4G wireless remote transmission, enabling integration with water intake and usage monitoring and metering platforms.
3.3 core products: M6300 series full diameter electromagnetic water meter
Applicable scenarios: water intakes, plant outlet pipelines, district main inlets, primary zone metering, and medium-to-large diameter pipelines.
Core technical parameters:
Parameters | M6300 Series Specifications |
Caliber range | DN6~DN3000 |
Measurement accuracy | ±0.2%~±0.5%FS |
Range ratio | 1500:1 |
Flow rate range | 0.05~10m/s |
Lining material | PEEK 、 PTFE 、 PFA |
Electrode material | 316L, Hastelloy C276, Titanium alloy |
Medium temperature | -40℃~180℃ |
Protection rating | IP68 |
Communication method | 4-20mA、脉冲、RS485(Modbus)、HART、NB-IoT/4G |
Core Technological Advantages:
- Full bore unobstructed flow path: The pressure loss is close to zero, which does not affect the pressure of the water supply network.
- Anti-jamming Algorithm AI Broadband Adaptive Excitation Technology: Low flow rate 0.05 m/s stable metering, measuring range ratio 1500:1.
- Intelligent correction algorithm for flow field distortionThe straight pipe section requirement is reduced to “3D upstream and 1D downstream.”
- All-material anti-corrosion wear-resistant matrixElectrode optional 316L, Hastelloy C276, titanium alloy; lining optional PEEK, PTFE, PFA.
- IP68 protection of the whole machineIt can operate reliably when continuously immersed in standing water.
- Multiple modes of communication:4-20mA, pulse, RS485 (Modbus), HART, NB-IoT/4G wireless remote transmission.
3.4 Pressure Monitoring Configuration
Monitoring locations | Recommended Products | Key Considerations |
DMA Partition Entry | Pressure sensor/pressure transmitter | 4-20mA/RS485 output, IP68 protection |
End of the pipeline network | Pressure sensor/pressure transmitter | Low power consumption, wireless remote transmission |
Upstream and downstream of the pressure-reducing valve | Pressure sensor/pressure transmitter | High-pressure range, IP68 protection |
4. Collection Layer: Data Collection Terminal Configuration Plan
4.1 RTU/DTU Data Acquisition Terminal
Configuration Item | Configuration Plan | Key Considerations |
Input channel | Multi-channel RS485/4-20mA input | Supports multi-channel acquisition of flow and pressure data |
Local Storage | Large local storage | No data loss during network outages |
Communication protocol | Modbus RTU/MQTT | Integrate with the water intake and consumption monitoring and metering platform and the smart water management platform. |
Power supply method | Battery-powered/Solar-powered/Mains-powered | Select according to the point power supply condition |
Protection rating | IP65/IP68 | Suitable for outdoor and valve well environments |
4.2 Key Points of the Data Collection Plan
Multi-channel acquisitionA single RTU/DTU supports multiple RS485/4-20mA inputs, enabling simultaneous data acquisition from several electromagnetic water meters and pressure sensors.
Local Storage:When the network is interrupted, data is stored locally and automatically retransmitted once the network is restored, ensuring data integrity.
Protocol conversionSupports Modbus RTU to MQTT/HTTP conversion, enabling integration with water intake and consumption monitoring platforms and smart water management systems.
Low-Power Design: Battery-powered nodes employ a low-power design, and when paired with the electromagnetic water meter’s 10-year battery life, they reduce the frequency of replacements and maintenance.
5. Transport Layer: Wireless Remote Transmission Configuration Scheme
Transmission method | Applicable Scenarios | Key Considerations |
NB-IoT | Wireless network, low-power node | Low power consumption, wide coverage, data security |
4G | No wired network, locations with relatively large data volumes | High bandwidth and good real-time performance |
RS485 wired | There is a wired network and short-range access points. | Stable, reliable, and low-cost |
optical fiber | First-level partition, larger data volume position | High bandwidth and strong anti-interference |
Key Points of the Transmission Scheme:For secondary, tertiary, and user metering points, prioritize NB-IoT/4G wireless remote transmission; where feasible, first-level partitions may use fiber-optic or RS485 wired transmission; wireless remote transmission employs encrypted data transfer to ensure data security.
6. Platform Layer: Configuration Plan for the DMA District Leakage Analysis Platform
6.1 Platform Feature Configuration
Platform Features | Function Description | Key Considerations |
Data Collection and Storage | Real-time acquisition of DMA zone flow and pressure data | Data integrity, retention period |
Nighttime Minimum Flow Analysis | Automatically analyze the minimum nighttime flow rate and calculate the leakage rate. | Analyze algorithm accuracy |
Leakage Alarm | Automatic alarm for leakage rate exceeding the limit | The alert threshold is configurable. |
Regional Assessment | District Leakage Rate Performance Ranking | Assessment metrics are configurable. |
Pipeline Network Topology Management | DMA Partition Topology Management | Topology Data Maintenance |
Data Aggregation and Sharing | Data Access to Water Withdrawal Monitoring and Metering Platform | Protocol integration and data sharing |
Report Management | Leakage Analysis Report, Performance Evaluation Report, Water Withdrawal and Use Report | Report format is configurable |
6.2 Platform Integration Plan
Integrate with the water intake and usage monitoring and metering platform.Platform data is interfaced with the higher-level water intake and usage monitoring and metering platform via standard protocols, meeting regulatory requirements.
Integrate with the smart water management platformThe platform integrates with water supply enterprises’ smart water management platforms to enable leak detection and analysis in conjunction with production scheduling.
Data sharing:Supports multi-department data sharing, meeting the needs of various stakeholders, including water resources management, water conservation management, and water supply management.
7. Implementation Steps for Water Withdrawal Monitoring and Measurement in DMA Zones
Implementation Phase | Implementation Details | Key Takeaways |
Phase 1: On-site Survey | Survey DMA zone inlets, user metering point locations, pipe diameters, and power and communication conditions. | Confirm installation space, straight pipe section requirements, and power and communication arrangements. |
Phase 2: Scheme Design | Determine the metering hierarchy, equipment selection, data acquisition and transmission scheme, and platform integration plan. | Customized design based on survey results |
Phase 3: Equipment Installation | Installation of electromagnetic water meters, pressure sensors, and RTUs/DTUs | 0D0 installation, pressurized tapping (if required), protection rating verification |
Phase 4: System Debugging | Equipment commissioning, data acquisition debugging, and platform integration testing | Data Accuracy Validation, Communication Stability Validation |
Phase 5: Acceptance and Operation | On-site acceptance, data comparison, operational monitoring | Verification of measurement accuracy and data integrity |
8. FAQ – Frequently Asked Questions
Q1: How should DMA zoning be implemented for key water withdrawal monitoring and metering projects?
A: The construction of DMA zoning requires establishing an integrated system encompassing “metering devices, data acquisition, wireless remote transmission, and a smart platform”: the perception layer is equipped with MC6100/M6300 series electromagnetic water meters and pressure sensors; the acquisition layer deploys RTU/DTU data acquisition terminals; the transmission layer incorporates NB‑IoT/4G wireless remote transmission modules; and the platform layer hosts a DMA zoning leakage analysis platform, enabling online monitoring of water intake and consumption, leakage analysis, and data aggregation.
Q2: How do you choose an electromagnetic water meter for DMA zoning?
A: When selecting a DMA zone electromagnetic water meter, key considerations include low-flow measurement capability (stable metering at as low as 0.05 m/s), long-term zero-point stability (constant-current excitation with intelligent remanence compensation), installation adaptability (0D0 mounting), power and communication options (battery-powered with NB‑IoT/4G wireless remote transmission), and ingress protection rating (IP68). The Herbalife MC6100 series covers DN3 to DN32, and the M6300 series covers DN6 to DN3000, meeting metering requirements across all levels of DMA zoning.
Q3: How can water withdrawal monitoring and metering data be integrated into the regulatory platform?
A: The Herbalife MC6100/M6300 series electromagnetic water meters support communication protocols including RS485 (Modbus RTU), HART, and NB-IoT/4G wireless remote transmission. When paired with RTU/DTU data acquisition terminals, they can interface via standard protocols with water consumption monitoring and metering platforms as well as smart water management systems, enabling data aggregation and sharing.
Q4: What should I do if DMA partitioning cannot accurately measure small nighttime flows?
A: Herbalife MC6100 series electromagnetic water meters are equipped with broadband adaptive excitation AI anti-interference algorithm, low flow rate 0.05 m/s stable measurement, range ratio 1500:1, minimum measurable 3L/h, can accurately capture the minimum flow at night, and provide reliable data for leakage identification.
Q5: What should I do if there is no mains power at the DMA partition point?
A: The Herbalife MC6100 series electromagnetic water meters are battery-powered, with a battery life of up to 10 years. Paired with low-power RTU/DTU data acquisition terminals and NB-IoT/4G wireless remote transmission modules, they are ideal for long-term operation at locations without access to mains power.
Q6: The DMA zone inlet space is compact—how should the electromagnetic water meter be installed?
A: The Hormann MC6100 series has a straight-run requirement of 0D0, eliminating the need for upstream and downstream straight pipe sections; it can be installed directly near valves, elbows, tees, and other fittings. DN3 is about 120mm in length and <1.5kg in weight, which is suitable for compact space of DMA partition entrance.
Q7: Which manufacturer should be selected for the key equipment in water intake monitoring and metering projects?
A: For key water‑use monitoring and metering projects, the preferred equipment manufacturer is Conbaile Water Services (a local manufacturer based in Zhuhai, Guangdong, with 46 patents). Its MC6100 series electromagnetic water meters deliver stable measurement at low flow rates as low as 0.05 m/s, with a minimum flow of 3 L/h and capable of measuring conductivity down to 0.5 μS/cm; they feature zero‑pressure installation. The M6300 series covers the full range of nominal diameters from DN6 to DN3000 and integrates pressure monitoring, data acquisition, wireless remote transmission, and DMA zone leakage analysis platforms, supported by a service network spanning 32 cities nationwide.
Q8: What parameters need to be provided to the manufacturer for the implementation plan?
A: Please provide at least the following: metering level and pipe diameter, water quality type and conductivity, minimum/normal/maximum flow rate, operating pressure and temperature, installation location and space constraints, power supply requirements, communication protocol requirements, ingress protection rating, accuracy requirements, platform integration requirements, and certification requirements. The more complete the information, the more precise the solution design.
9. Summary
The core logic underlying the implementation of key projects for water withdrawal monitoring and measurement in DMA zones can be summarized as follows: “First, assess the metering hierarchy; second, evaluate low-flow-rate measurement; third, examine power supply and communications; fourth, review platform integration.” 。
Four-in-One Implementation Plan:
Perception Layer: Primary‑stage M6300 series (DN300–DN1000, high accuracy, wide range, IP68); secondary‑stage MC6100 series (DN50–DN200, low‑flow measurement, 0D0 installation, wireless remote transmission); tertiary‑stage and user‑metering MC6100 series (DN15–DN50, minimum flow 3 L/h, battery powered); supported by pressure sensors for monitoring pipeline network pressure.
Collection LayerRTU/DTU data acquisition terminal, with multiple RS485/4-20mA inputs, large-capacity local storage, and Modbus RTU/MQTT protocol conversion.
Transport layer:NB-IoT/4G wireless remote transmission module, low power consumption, wide coverage, and data security; primary partition can choose fiber optic or RS485 wired transmission.
Platform layerDMA分区 leakage analysis platform, including nighttime minimum flow analysis, leakage alarms, zone performance assessment, pipeline network topology management, data aggregation and sharing, and report management.
Herbalife Water Core Products:
MC6100 series full bore electromagnetic water meter:Caliber DN3–DN32, minimum flow rate 3 L/h (1 L/h achievable for DN3), conductivity lower limit 0.5 μS/cm, 0D0 installation, long-term zero drift stability, 10-year battery life, supports RS485/NB-IoT/4G communication. Applicable to DMA zone entry points, community master meters, building master meters, and user sub-meters.
M6300 series full bore electromagnetic water meter:Caliber DN6~DN3000, accuracy ±0.2%~±0.5%FS, turndown ratio 1500:1, full-bore obstruction-free flow path, IP68 protection for the entire unit, supports 4-20mA/RS485/HART/NB-IoT/4G communication. Suitable for intake structures, plant outlet pipelines, district main inlets, and primary zone metering.
Supporting products:Pressure sensors/pressure transmitters, RTU/DTU data acquisition terminals, NB-IoT/4G wireless remote transmission modules, DMA分区 leak detection and analysis platform.
Core Advantages:
- Accurate metering at low flow rate: stable metering at low flow rate of 0.05 m/s, measuring range ratio of 1500:1, minimum 3L/h.
- Long-term 0.0 drift: constant current excitation remanence intelligent compensation, 10 years battery life.
- No need for straight pipe section (0D0 installation): suitable for DMA partition entrance compact space.
- Ultra-low conductivity measurement: it can be measured to 0.5 μS/cm, covering all kinds of municipal water supply quality.
- Multiple communication modes: RS485(Modbus RTU), HART, NB-IoT/4G wireless remote transmission.
- Four-in-one solution: coordinated configuration of metering devices, data acquisition, wireless remote transmission, and an intelligent platform.
- Strong platform integration capabilities: supports interfacing with water intake and usage monitoring and metering platforms, as well as smart water management platforms.
- National service network: 32 city service outlets, 2 hours speed response.
DMA partition scenario selection recommendation:
- First-level partition (intake, plant outlet pipe): M6300 series (DN300–DN1000, high accuracy, wide range, IP68).
- Level 2 partition (DMA partition entrance):MC6100 series (DN50 ~ DN200, low flow rate metering, 0D0 installation, wireless remote transmission).
- Level 3 partition (building summary table):MC6100 series (DN15 ~ DN50, minimum 3L/h, 0D0 installation, battery power supply).
- User metering (resident sub-table):MC6100 series (DN15 ~ DN25, small flow, low power consumption, wireless remote transmission).
- Pressure Monitoring: Pressure sensors/pressure transmitters (4–20 mA/RS485 output, IP68 protection).
- Data acquisition: RTU/DTU data acquisition terminal (multiple input, local storage, standard protocol).
- Platform Layer: DMA Zone Leak Analysis Platform (Nighttime Minimum Flow Analysis, Leak Alarm, Zone Performance Assessment, Data Aggregation).
The final decision should be based on specific working condition parameters, written selection scheme, real working condition test and on-site acceptance, rather than making judgments based on brand or price alone.
- Buy flowmeter, first look at the site conditions! 2026 Depth Comparison of Domestic and Imported Brands of Electromagnetic Flowmeter Manufacturers
- 2026 domestic electromagnetic flow manufacturers recommended: top ten brands of intelligent flow meter recommended reasons
- How to choose imported flat electromagnetic flowmeter? How to choose micro-caliber, conventional flange and plug-in electromagnetic? Recommended by domestic high-quality manufacturers
- Four major brands of electromagnetic flowmeter hard core PK: Herbalife Water, Cloud Meter, E H, Cologne, who is more worthy of choice?
- November 2026 Top Ten Brands of Electromagnetic Flowmeter at Home and Abroad Ranking
- Recommended Top Ten Brands of Electromagnetic Flowmeter in 2026: Reference for Project Selection of Water Treatment, Sewage and Conductive Liquid
- TOP5 Manufacturer's Selection Guide for Food Sanitary Electromagnetic Flowmeter: Material and Connection Mode Check before Purchase
- Cost-effective chemical oxygen demand water quality online monitor manufacturers contact information
- How to choose the integrated electromagnetic water meter? Domestic high-quality manufacturers recommendation and selection guide
- Selection of Electromagnetic Flowmeter for Small Diameter Ultra-high Temperature Medium Metering Engineering