1、MicroFLOW M6320 slurry electromagnetic flowmeterInstallation should be away from elbows, obstacles, variable diameter, valves, in order to ensure a stable flow field, while requiring a longer upper limit of straight pipe, straight pipe length greater than 10D, straight pipe section longer than 5D.
2. Site environment installationMicroFLOW M6320 slurry electromagnetic flowmeterWhen the requirements of straight pipe section cannot be met, rectifiers can be connected in series to greatly reduce the requirements for straight pipe section.
3, ifMicroFLOW M6320 slurry electromagnetic flowmeterWhen installed outdoors, the instrument sunshade shall be added to avoid sun and rain.
4、MicroFLOW M6320 slurry electromagnetic flowmeterIt is prohibited to install in strong vibration occasions and environments containing a large amount of corrosive gases.
5、MicroFLOW M6320 slurry electromagnetic flowmeterDuring installation, do not share the power supply with equipment that pollutes the power supply, such as frequency converter and electric welding machine. If necessary, install purified power supply for the instrument.
6、MicroFLOW M6320 slurry electromagnetic flowmeterBefore pre-installation, please reconfirm the connection mode of the pipe section and prepare related items such as gaskets and bolts for flange connection. Production must be stopped before installation and the relevant regulations of the factory must be strictly observed.
Intelligent metering is based on the permanent magnet to generate a stable working magnetic field, with 0.3 seconds of high-frequency sampling, accurate metering, intelligent learning of water rules, automatic...
The electromagnetic flowmeter uses the principle of Faraday's law of phenol water induction, that is, when a conductive object moves in a magnetic field to cut a magnetic wire, a sense is generated in the conductor...
This product is a highly reliable, integrated insertion electromagnetic flowmeter designed for the flow measurement of conductive liquids such as municipal sewage and industrial wastewater....